X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585030605000

Well Details

Well ID: 0585030605000
Loading map...
Location: 00/05-06-058-03W5/0
Location Alias: 00/05-06-58-03 W5M
Location Alias 2: 00/05-06-058-03 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 03
Section: 06
County/Municipality: County of Barrhead No. 11
Well Name: ULSTER NEWTON 5-6-58-3
Operator Name: Devon Aog Corporation
License Number: 0154493
License Date: 1992-11-13
License Status: RecCertified
Spud Date: 1992-11-19
Final Drill Date: 1992-11-24
Well Total Depth: 1210.00 m
Surface Hole Latitude: 53.981988
Surface Hole Longitude: -114.445413

For data sources see[1][2]

Well History

Date Event
1992-11-13 Obtained License
1992-11-20 Surface Casing Operation Performed
1992-11-24 Finished Drilling
1992-11-24 Well Mode changed to Drilled and Cased
1992-11-25 Drill Stem Test Performed
1992-11-25 Well Log Performed
1992-11-26 Drill Stem Test Performed
1992-11-27 Production Casing Operation Performed
1992-11-27 Rig Released
1992-12-21 Perforation Treatment Performed - Jet Perforation
1992-12-23 Perforation Treatment Performed - Fractured
1993-01-02 Perforation Treatment Performed - Jet Perforation
1993-01-02 Well Log Performed
1993-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-07 Well Began Production
1993-01-07 Well Fluid changed to Crude Oil
1993-01-07 Well Mode changed to Pumping
1993-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-03 Plug Back Performed
1993-05-03 Well Abandoned
1993-05-03 Well Fluid changed to Crude Oil
1993-05-03 Well Mode changed to Abandoned
1993-05-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-21 Perforation 1154.00 1156.00 13
1992-12-23 Fracture 1154.00 1156.00 0
1993-01-02 Perforation 1158.00 1160.00 13
1993-01-03 Acid Treatment 1158.00 1160.00 0
1993-05-03 Packing Device Capped w/Cement 1137.00 1145.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1002 0.0 0.0 0.0

For data sources see[5]

References