X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0585022211000

Well Details

Well ID: 0585022211000
Loading map...
Location: 00/11-22-058-02W5/0
Location Alias: 00/11-22-58-02 W5M
Location Alias 2: 00/11-22-058-02 W5/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 5
Range: 02
Section: 22
County/Municipality: County of Barrhead No. 11
Well Name: AXIOM MANOLA 11-22-58-2
Operator Name: Axiom Oil and Gas Inc.
License Number: 0321949
License Date: 2004-12-16
License Status: Abandoned
Spud Date: 2005-02-01
Final Drill Date: 2005-02-07
Well Total Depth: 1165.00 m
Surface Hole Latitude: 54.030101
Surface Hole Longitude: -114.213888

For data sources see[1][2]

Well History

Date Event
2004-12-16 Obtained License
2005-02-03 Surface Casing Operation Performed
2005-02-06 Well Log Performed
2005-02-07 Finished Drilling
2005-02-07 Well Log Performed
2005-02-07 Well Mode changed to Drilled and Cased
2005-02-08 Production Casing Operation Performed
2005-02-08 Rig Released
2005-02-13 Well Log Performed
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-02-18 Well Log Performed
2005-02-21 Perforation Treatment Performed - Fractured
2005-03-27 Well Began Production
2005-03-27 Well Fluid changed to Gas
2005-03-27 Well Mode changed to Flowing
2009-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-11 Plug Back Performed
2009-02-11 Well Fluid changed to Gas
2009-02-11 Well Mode changed to Abandoned Zone
2009-03-11 Perforation Treatment Performed - Jet Perforation
2009-03-13 Perforation Treatment Performed - Cement Squeeze
2009-03-13 Plug Back Performed
2009-08-29 Perforation Treatment Performed - Jet Perforation
2009-08-30 Perforation Treatment Performed - Remedial Casing
2009-08-31 Perforation Treatment Performed - Jet Perforation
2009-09-01 Perforation Treatment Performed - Remedial Casing
2009-09-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-09-25 Perforation Treatment Performed - Remedial Casing
2009-12-30 Well Abandoned
2009-12-30 Well Fluid changed to Gas
2009-12-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-18 Perforation 1127.50 1130.50 17
2009-08-29 Perforation 462.00 463.00 17
2009-08-30 Remedial Casing Cementing 462.00 463.00 0
2009-08-31 Perforation 198.50 199.50 17
2009-09-01 Remedial Casing Cementing 198.50 199.50 0
2009-09-24 Hydra Jet Perforation 184.80 187.00 1
2009-09-25 Remedial Casing Cementing 184.80 187.00 0
2005-02-18 Perforation 1119.50 1124.00 17
2005-02-21 Fracture 1127.50 1130.50 0
2005-02-21 Fracture 1119.50 1124.00 0
2009-02-11 Packing Device Capped w/Cement 1101.50 1109.50 0
2009-03-11 Perforation 1127.50 1130.50 17
2009-03-11 Perforation 1119.50 1124.00 17
2009-03-13 Cement Squeeze 1127.50 1130.50 0
2009-03-13 Cement Squeeze 1119.50 1124.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 5295 0.0 0.0 0.0
2006 6814 0.0 0.0 0.0
2007 45 0.0 0.0 0.0

For data sources see[5]

References