If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0584231214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.99307,"lon":-113.28394,"icon":""}]} |
Location: 00/14-12-058-23W4/0 | |
Location Alias: 00/14-12-58-23 W4M | |
Location Alias 2: 00/14-12-058-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 23 | |
Section: 12 | |
County/Municipality: Thorhild County | |
Well Name: LONG RUN HZ REDWATER 14-12-58-23 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0426214 | |
License Date: 2010-11-23 | |
License Status: Issued | |
Spud Date: 2010-12-15 | |
Final Drill Date: 2011-01-02 | |
Well Total Depth: 1850.00 m | |
Surface Hole Latitude: 53.993070 | |
Surface Hole Longitude: -113.283940 |
Date | Event |
---|---|
2010-11-23 | Obtained License |
2010-12-15 | Surface Casing Operation Performed |
2010-12-15 | Well Log Performed |
2010-12-29 | Direction Drilling Operation Performed - Horizontal |
2010-12-29 | Well Log Performed |
2011-01-02 | Finished Drilling |
2011-01-02 | Well Log Performed |
2011-01-02 | Well Mode changed to Drilled and Cased |
2011-01-04 | Production Casing Operation Performed |
2011-01-05 | Rig Released |
2011-01-15 | Well Log Performed |
2011-01-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-11 | Well Began Production |
2011-03-11 | Well Fluid changed to Crude Oil |
2011-03-11 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-29 | 478.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-28 | Multi-Stage Fracture | 860.10 | 860.50 | 0 |
2011-01-28 | Multi-Stage Fracture | 1184.50 | 1184.90 | 0 |
2011-01-28 | Multi-Stage Fracture | 1215.10 | 1215.50 | 0 |
2011-01-28 | Multi-Stage Fracture | 1245.20 | 1245.60 | 0 |
2011-01-28 | Multi-Stage Fracture | 1275.80 | 1276.20 | 0 |
2011-01-28 | Multi-Stage Fracture | 1306.40 | 1306.80 | 0 |
2011-01-28 | Multi-Stage Fracture | 1337.00 | 1337.40 | 0 |
2011-01-28 | Multi-Stage Fracture | 1367.60 | 1368.00 | 0 |
2011-01-28 | Multi-Stage Fracture | 1398.30 | 1398.70 | 0 |
2011-01-28 | Multi-Stage Fracture | 1428.90 | 1429.30 | 0 |
2011-01-28 | Multi-Stage Fracture | 1459.60 | 1460.00 | 0 |
2011-01-28 | Multi-Stage Fracture | 903.00 | 903.30 | 0 |
2011-01-28 | Multi-Stage Fracture | 1490.20 | 1490.60 | 0 |
2011-01-28 | Multi-Stage Fracture | 1520.70 | 1521.10 | 0 |
2011-01-28 | Multi-Stage Fracture | 1551.20 | 1551.60 | 0 |
2011-01-28 | Multi-Stage Fracture | 1581.70 | 1582.10 | 0 |
2011-01-28 | Multi-Stage Fracture | 1612.30 | 1612.70 | 0 |
2011-01-28 | Multi-Stage Fracture | 1642.90 | 1643.30 | 0 |
2011-01-28 | Multi-Stage Fracture | 1673.50 | 1673.90 | 0 |
2011-01-28 | Multi-Stage Fracture | 1704.10 | 1704.50 | 0 |
2011-01-28 | Multi-Stage Fracture | 1734.70 | 1735.10 | 0 |
2011-01-28 | Multi-Stage Fracture | 945.70 | 946.10 | 0 |
2011-01-28 | Multi-Stage Fracture | 987.60 | 988.00 | 0 |
2011-01-28 | Multi-Stage Fracture | 1031.80 | 1032.20 | 0 |
2011-01-28 | Multi-Stage Fracture | 1062.30 | 1062.70 | 0 |
2011-01-28 | Multi-Stage Fracture | 1092.80 | 1093.20 | 0 |
2011-01-28 | Multi-Stage Fracture | 1123.30 | 1123.70 | 0 |
2011-01-28 | Multi-Stage Fracture | 1153.80 | 1154.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5075 | 0.0 | 0.0 | 0.0 |
2012 | 6988 | 0.0 | 0.0 | 0.0 |
2013 | 7246 | 0.0 | 0.0 | 0.0 |
2014 | 8687 | 0.0 | 0.0 | 0.0 |
2015 | 8484 | 0.0 | 0.0 | 0.0 |
2016 | 8775 | 0.0 | 0.0 | 0.0 |
2017 | 8543 | 0.0 | 0.0 | 0.0 |
2018 | 8087 | 0.0 | 0.0 | 0.0 |
2019 | 2232 | 0.0 | 0.0 | 0.0 |
For data sources see[6]