If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0584231213020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.996191,"lon":-113.291443,"icon":""}]} |
Location: 02/13-12-058-23W4/0 | |
Location Alias: 02/13-12-58-23 W4M | |
Location Alias 2: 02/13-12-058-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 058 | |
Meridian: 4 | |
Range: 23 | |
Section: 12 | |
County/Municipality: Thorhild County | |
Well Name: LONG RUN HZ 102 REDWATER 13-12-58-23 | |
Operator Name: Long Run Exploration Ltd. | |
License Number: 0480825 | |
License Date: 2016-10-19 | |
License Status: Issued | |
Spud Date: 2017-01-13 | |
Final Drill Date: 2017-01-15 | |
Well Total Depth: 1640.00 m | |
Surface Hole Latitude: 53.996191 | |
Surface Hole Longitude: -113.291443 |
Date | Event |
---|---|
2016-10-19 | Obtained License |
2017-01-13 | Surface Casing Operation Performed |
2017-01-14 | Direction Drilling Operation Performed - Deviate |
2017-01-15 | Direction Drilling Operation Performed - Horizontal |
2017-01-15 | Finished Drilling |
2017-01-15 | Well Log Performed |
2017-01-15 | Well Mode changed to Drilled and Cased |
2017-01-16 | Production Casing Operation Performed |
2017-01-16 | Rig Released |
2017-01-16 | Well Log Performed |
2017-02-09 | Well Log Performed |
2017-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-03-15 | Well Began Production |
2017-03-15 | Well Fluid changed to Crude Oil |
2017-03-15 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-01-13 | Bonanza Drilling Inc. | 4 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-14 | 340.60 | Deviate (5 - 79 degrees) |
2017-01-15 | 892.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-15 | Multi-Stage Fracture | 1617.00 | 1617.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1347.00 | 1347.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1317.00 | 1317.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1289.00 | 1289.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1257.00 | 1257.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1227.00 | 1227.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1199.00 | 1199.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1167.00 | 1167.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1137.00 | 1137.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1107.00 | 1107.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1077.00 | 1077.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1587.00 | 1587.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1047.00 | 1047.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1017.00 | 1017.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 987.00 | 987.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1556.00 | 1556.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1527.00 | 1527.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1497.00 | 1497.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1468.00 | 1468.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1437.00 | 1437.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1407.00 | 1407.10 | 0 |
2017-02-15 | Multi-Stage Fracture | 1379.00 | 1379.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-02-15 | 2017-02-15 | 702 | 485 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Potassium Chloride | 7447-40-7 | 100 | 79.0901 | N/A | |||
Water | 7732-18-5 | 100 | 79.0901 | N/A | ||||
Sand (20/40) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.7763 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.7763 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.7763 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.7763 | N/A | ||||
Yukon Black (16/30) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 17.7595 | N/A | ||
Furfuryl Alcohol | 98-00-0 | 100 | 17.7595 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0155 | N/A | |
Water | 7732-18-5 | 100 | 0.0155 | N/A | ||||
CAN-2300 Breaker (Enzyme HpH. 50L:1L) | Canyon Technical Services | Breaker | Cellulase Enzyme Solution | Not Available | 100 | 0.0881 | N/A | |
Water | 7732-18-5 | 100 | 0.0881 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0264 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0264 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.3851 | N/A | |
Water | 7732-18-5 | 100 | 0.3851 | N/A | ||||
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1827 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.1827 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1827 | N/A | ||||
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0385 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0385 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0385 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0385 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0385 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.4798 | N/A | |
paraFLO 2 | Canyon Technical Services | Scale Inhibitor | Non-hazardous base ingredient(s) | Not Available | 100 | 0.1573 | N/A | |
Silica. crystalline-quartz | 14808-60-7 | 100 | 0.1573 | N/A | ||||
White mineral oil | 8042-47-5 | 100 | 0.1573 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-15 | 2017-02-15 | Municipal Water | 420 |
2017-02-15 | 2017-02-15 | Groundwater - Saline | 13 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 6972 | 0.0 | 0.0 | 0.0 |
2018 | 8057 | 0.0 | 0.0 | 0.0 |
2019 | 8717 | 0.0 | 0.0 | 0.0 |
2020 | 2166 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-01-16 | No Incident Encountered | 0.00 | 0.00 |
2017-02-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]