X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584231207022

Well Details

Well ID: 0584231207022
Loading map...
Location: 02/07-12-058-23W4/2
Location Alias: 02/07-12-58-23 W4M
Location Alias 2: 02/07-12-058-23 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 23
Section: 12
County/Municipality: Thorhild County
Well Name: LONG RUN REDWATER 7-12-58-23
Operator Name: Long Run Exploration Ltd.
License Number: 0154162
License Date: 1992-10-20
License Status: Issued
Spud Date: 1992-12-16
Final Drill Date: 1992-12-20
Well Total Depth: 949.00 m
Surface Hole Latitude: 53.998992
Surface Hole Longitude: -113.284042

For data sources see[1][2]

Well History

Date Event
1992-10-20 Obtained License
1992-12-17 Surface Casing Operation Performed
1992-12-20 Finished Drilling
1992-12-20 Well Log Performed
1992-12-20 Well Mode changed to Drilled and Cased
1992-12-21 Production Casing Operation Performed
1992-12-21 Rig Released
1993-01-04 Perforation Treatment Performed - Jet Perforation
1993-01-04 Perforation Treatment Performed - Remedial Casing
1993-01-05 Perforation Treatment Performed - Jet Perforation
1995-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-28 Perforation Treatment Performed - Jet Perforation
1995-06-28 Plug Back Performed
1995-06-29 Well Began Production
1995-06-29 Well Fluid changed to Gas
1995-06-29 Well Mode changed to Flowing
1997-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-08-29 Perforation Treatment Performed - Jet Perforation
1998-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-04 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-01-04 Perforation 465.00 466.00 13
1998-08-04 Packing Device Capped w/Cement 688.00 696.00 0
1998-08-04 Perforation 668.00 672.00 13
1993-01-04 Remedial Casing Cementing 465.00 466.00 0
1993-01-05 Perforation 827.50 829.30 13
1993-01-05 Perforation 831.50 833.00 13
1993-01-05 Perforation 834.00 835.50 13
1995-06-28 Packing Device Capped w/Cement 817.00 825.00 0
1995-06-28 Perforation 762.00 763.00 13
1997-08-29 Packing Device Capped w/Cement 746.00 754.00 0
1997-08-29 Perforation 698.00 699.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4414 0.0 0.0 0.0
1996 7656 0.0 0.0 0.0
1997 6966 0.0 0.0 0.0
1998 8500 0.0 0.0 0.0
1999 8672 0.0 0.0 0.0
2000 8516 0.0 0.0 0.0
2001 8675 0.0 0.0 0.0
2002 8742 0.0 0.0 0.0
2003 8628 0.0 0.0 0.0
2004 8737 0.0 0.0 0.0
2005 8745 0.0 0.0 0.0
2006 8643 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8774 0.0 0.0 0.0
2009 8331 0.0 0.0 0.0
2010 7313 0.0 0.0 0.0
2011 7275 0.0 0.0 0.0
2012 7707 0.0 0.0 0.0
2013 8546 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7080 0.0 0.0 0.0
2016 6589 0.0 0.0 0.0
2017 6583 0.0 0.0 0.0
2018 2063 0.0 0.0 0.0
2019 7128 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References