X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584221916000

Well Details

Well ID: 0584221916000
Loading map...
Location: 00/16-19-058-22W4/0
Location Alias: 00/16-19-58-22 W4M
Location Alias 2: 00/16-19-058-22 W4/00
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 22
Section: 19
County/Municipality: Thorhild County
Well Name: ALBERCAN REDWATER 16-19-58-22
Operator Name: Albercan Oil Corporation
License Number: 0003983
License Date: 1951-12-21
License Status: RecExempt
Spud Date: 1952-01-17
Final Drill Date: 1952-01-29
Well Total Depth: 979.90 m
Surface Hole Latitude: 54.034070
Surface Hole Longitude: -113.250684

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-21 Obtained License
1952-01-29 Drill Stem Test Performed
1952-01-29 Finished Drilling
1952-01-29 Well Mode changed to Drilled and Cased
1952-01-30 Drill Stem Test Performed
1952-01-31 Perforation Treatment Performed - Open-Hole Completion
1952-01-31 Production Casing Operation Performed
1952-02-03 Perforation Treatment Performed - Acid Wash - No Pressure
1952-02-24 Perforation Treatment Performed - Open-Hole Completion
1952-02-24 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1952-03-25 Well Began Production
1952-03-25 Well Fluid changed to Crude Oil
1952-03-25 Well Mode changed to Pumping
1952-07-02 Drill Stem Test Performed
1952-07-02 Perforation Treatment Performed - Open-Hole Completion
1952-07-03 Perforation Treatment Performed - Acid Wash - No Pressure
1952-07-03 Perforation Treatment Performed - Jet Perforation
1954-03-29 Perforation Treatment Performed - Cement Plug
1954-03-31 Well Abandoned
1954-03-31 Well Fluid changed to Crude Oil
1954-03-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-31 Open Hole/Barefoot Completion 974.10 976.90 0
1952-02-03 Acid Wash 974.10 976.90 0
1952-02-24 Resin-Gypsum Squeeze or Plug 975.70 976.90 0
1952-02-24 Open Hole/Barefoot Completion 974.10 975.70 0
1952-07-02 Open Hole/Barefoot Completion 974.10 977.50 0
1952-07-03 Perforation 974.80 977.20 13
1952-07-03 Acid Wash 974.80 977.20 0
1954-03-29 Cement Plug 949.50 977.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References