X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0584122707002

Well Details

Well ID: 0584122707002
Loading map...
Location: 00/07-27-058-12W4/2
Location Alias: 00/07-27-58-12 W4M
Location Alias 2: 00/07-27-058-12 W4/02
Country: Canada
Province: Alberta
Township: 058
Meridian: 4
Range: 12
Section: 27
County/Municipality: Saddle Lake 125
Well Name: CNRL CACHE 7-27-58-12
Operator Name: Canadian Natural Resources Limited
License Number: 0045229
License Date: 1973-02-26
License Status: Abandoned
Spud Date: 1973-03-09
Final Drill Date: 1973-03-12
Well Total Depth: 670.60 m
Surface Hole Latitude: 54.039204
Surface Hole Longitude: -111.695488

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-02-26 Obtained License
1973-03-12 Finished Drilling
1973-03-12 Well Mode changed to Drilled and Cased
1973-03-13 Drill Stem Test Performed
1973-03-14 Drill Stem Test Performed
1973-03-15 Production Casing Operation Performed
1973-07-16 Perforation Treatment Performed - Jet Perforation
1973-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-07-27 Perforation Treatment Performed - Jet Perforation
1984-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-09-07 Perforation Treatment Performed - Jet Perforation
1984-09-07 Plug Back Performed
1984-09-07 Well Began Production
1984-09-07 Well Fluid changed to Gas
1984-09-07 Well Mode changed to Flowing
1996-03-17 Perforation Treatment Performed - Cement Squeeze
1996-03-17 Plug Back Performed
1996-03-18 Perforation Treatment Performed - Jet Perforation
1996-03-20 Perforation Treatment Performed - Jet Perforation
2000-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-08 Plug Back Performed
2000-01-09 Well Abandoned
2000-01-09 Well Fluid changed to Gas
2000-01-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-07-16 Perforation 474.00 475.50 13
1996-03-18 Perforation 479.10 481.60 13
1996-03-20 Perforation 488.20 491.30 13
1996-03-20 Perforation 481.60 485.20 13
2000-01-08 Packing Device Capped w/Cement 464.70 473.00 0
1973-07-18 Acid Treatment 474.00 475.50 0
1974-07-27 Perforation 479.10 481.60 13
1984-09-07 Packing Device Capped w/Cement 461.00 469.00 0
1984-09-07 Perforation 434.80 435.90 13
1996-03-17 Cement Squeeze 434.80 435.90 0
1996-03-17 Cement Squeeze 474.00 481.60 13
1996-03-18 Perforation 474.00 481.60 13
1996-03-18 Perforation 474.00 475.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1445 0.0 0.0 0.0
1985 6585 0.0 0.0 0.0
1986 6252 0.0 0.0 0.0
1987 5752 0.0 0.0 0.0
1988 6034 0.0 0.0 0.0
1989 6155 0.0 0.0 0.0
1990 6163 0.0 0.0 0.0
1991 6692 0.0 0.0 0.0
1992 5934 0.0 0.0 0.0
1993 8741 0.0 0.0 0.0
1994 8277 0.0 0.0 0.0
1995 8655 0.0 0.0 0.0
1996 1651 0.0 0.0 0.0

For data sources see[5]

References