X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575253511002

Well Details

Well ID: 0575253511002
Loading map...
Location: 00/11-35-057-25W5/2
Location Alias: 00/11-35-57-25 W5M
Location Alias 2: 00/11-35-057-25 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 25
Section: 35
County/Municipality: Yellowhead County
Well Name: PC ET AL BERLRW 11-35-57-25
Operator Name: Tourmaline Oil Corp.
License Number: 0311067
License Date: 2004-06-30
License Status: Issued
Spud Date: 2004-11-15
Final Drill Date: 2004-12-03
Well Total Depth: 3151.00 m
Surface Hole Latitude: 53.970441
Surface Hole Longitude: -117.611761

For data sources see[1][2]

Well History

Date Event
2004-06-30 Obtained License
2004-11-18 Surface Casing Operation Performed
2004-12-03 Finished Drilling
2004-12-03 Well Mode changed to Drilled and Cased
2004-12-04 Well Log Performed
2004-12-05 Well Log Performed
2004-12-07 Production Casing Operation Performed
2004-12-08 Rig Released
2004-12-13 Well Log Performed
2004-12-23 Well Log Performed
2005-01-04 Perforation Treatment Performed - Jet Perforation
2005-01-04 Well Log Performed
2009-10-22 Well Log Performed
2009-11-05 Well Log Performed
2009-11-08 Perforation Treatment Performed - Jet Perforation
2009-11-08 Well Log Performed
2009-11-09 Perforation Treatment Performed - Fractured
2009-11-10 Perforation Treatment Performed - Jet Perforation
2009-11-10 Well Log Performed
2009-11-11 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-04 Perforation 3109.50 3115.00 17
2009-11-10 Perforation 2232.50 2233.00 4
2009-11-10 Perforation 2222.50 2223.00 4
2009-11-10 Perforation 2214.50 2215.00 3
2009-11-11 Fracture 2214.50 2599.00 0
2009-11-08 Perforation 3071.50 3072.00 5
2009-11-08 Perforation 3041.00 3041.50 5
2009-11-08 Perforation 2908.00 2908.50 4
2009-11-08 Perforation 2860.00 2860.50 4
2009-11-08 Perforation 2799.00 2799.50 4
2009-11-09 Fracture 2799.00 3072.00 0
2009-11-10 Perforation 2598.50 2599.00 5
2009-11-10 Perforation 2576.50 2577.00 5

For data sources see[4]



References