X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575253307002

Well Details

Well ID: 0575253307002
Loading map...
Location: 00/07-33-057-25W5/2
Location Alias: 00/07-33-57-25 W5M
Location Alias 2: 00/07-33-057-25 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 25
Section: 33
County/Municipality: Yellowhead County
Well Name: PC BERLRW 7-33-57-25
Operator Name: Tourmaline Oil Corp.
License Number: 0318227
License Date: 2004-11-03
License Status: Issued
Spud Date: 2005-01-02
Final Drill Date: 2005-01-31
Well Total Depth: 3195.00 m
Surface Hole Latitude: 53.967031
Surface Hole Longitude: -117.651424

For data sources see[1][2]

Well History

Date Event
2004-11-03 Obtained License
2005-01-03 Lost Circulation Occurred
2005-01-06 Surface Casing Operation Performed
2005-01-15 Lost Circulation Occurred
2005-01-25 Lost Circulation Occurred
2005-01-31 Finished Drilling
2005-01-31 Well Log Performed
2005-01-31 Well Mode changed to Drilled and Cased
2005-02-03 Production Casing Operation Performed
2005-02-04 Rig Released
2005-02-26 Well Log Performed
2005-02-28 Well Log Performed
2005-03-01 Perforation Treatment Performed - Jet Perforation
2005-03-05 Perforation Treatment Performed - Fractured
2006-12-15 Well Log Performed
2009-10-24 Perforation Treatment Performed - Jet Perforation
2009-10-24 Well Log Performed
2009-10-25 Perforation Treatment Performed - Fractured
2009-10-26 Perforation Treatment Performed - Jet Perforation
2009-10-26 Well Log Performed
2009-10-27 Perforation Treatment Performed - Fractured
2009-12-09 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-01 Perforation 3161.00 3169.00 17
2009-10-26 Perforation 2279.00 2279.50 6
2009-10-26 Perforation 2275.50 2276.00 6
2009-10-26 Perforation 2263.50 2264.00 6
2009-10-27 Fracture 2263.50 2279.50 0
2005-03-05 Fracture 3161.00 3169.00 0
2009-10-24 Perforation 3023.00 3023.50 5
2009-10-24 Perforation 2858.00 2858.50 5
2009-10-24 Perforation 2648.00 2648.50 5
2009-10-24 Perforation 2938.00 2938.50 5
2009-10-24 Perforation 2829.50 2830.00 3
2009-10-24 Perforation 2637.00 2637.50 4
2009-10-25 Fracture 2637.00 3023.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2005-01-03 Lost Circulation 98.00 622.00
2005-01-15 Lost Circulation 2530.00 2946.00
2005-01-25 Lost Circulation 2993.00 2993.00

For data sources see[5]

References