X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575251012022

Well Details

Well ID: 0575251012022
Loading map...
Location: 02/12-10-057-25W5/2
Location Alias: 02/12-10-57-25 W5M
Location Alias 2: 02/12-10-057-25 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 25
Section: 10
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ02 WILD RIV 12-10-57-25
Operator Name: Tourmaline Oil Corp.
License Number: 0483211
License Date: 2017-03-17
License Status: Amended
Spud Date: 2018-08-03
Final Drill Date: 2018-09-20
Well Total Depth: 4670.00 m
Surface Hole Latitude: 53.907322
Surface Hole Longitude: -117.617709

For data sources see[1][2]

Well History

Date Event
2017-03-17 Obtained License
2018-08-04 Surface Casing Operation Performed
2018-08-26 Intermediate Casing Operation Performed
2018-09-11 Direction Drilling Operation Performed - Deviate
2018-09-14 Direction Drilling Operation Performed - Horizontal
2018-09-17 Direction Drilling Operation Performed - Horizontal
2018-09-20 Finished Drilling
2018-09-20 Well Log Performed
2018-09-20 Well Mode changed to Drilled and Cased
2018-09-23 Production Casing Operation Performed
2018-09-23 Rig Released
2018-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-05 Well Began Production
2018-11-05 Well Fluid changed to Gas
2018-11-05 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-09-11 2573.70 Deviate (5 - 79 degrees)
2018-09-14 3103.00 Horizontal
2018-09-17 3709.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-30 Multi-Stage Fracture 4611.90 4612.00 0
2018-10-31 Multi-Stage Fracture 4147.80 4147.90 0
2018-10-31 Multi-Stage Fracture 4095.00 4095.10 0
2018-10-31 Multi-Stage Fracture 4042.20 4042.30 0
2018-10-31 Multi-Stage Fracture 3989.40 3989.50 0
2018-10-31 Multi-Stage Fracture 3936.60 3936.70 0
2018-10-31 Multi-Stage Fracture 3883.80 3883.90 0
2018-10-31 Multi-Stage Fracture 3831.00 3831.10 0
2018-10-31 Multi-Stage Fracture 3778.20 3778.30 0
2018-10-31 Multi-Stage Fracture 3725.40 3725.50 0
2018-10-31 Multi-Stage Fracture 3672.60 3672.70 0
2018-10-30 Multi-Stage Fracture 4570.20 4570.30 0
2018-10-31 Multi-Stage Fracture 3619.80 3619.90 0
2018-10-31 Multi-Stage Fracture 3567.00 3567.10 0
2018-10-31 Multi-Stage Fracture 3514.90 3515.00 0
2018-11-01 Multi-Stage Fracture 3462.90 3463.00 0
2018-11-01 Multi-Stage Fracture 3410.10 3410.20 0
2018-11-01 Multi-Stage Fracture 3357.30 3357.40 0
2018-11-01 Multi-Stage Fracture 3304.50 3304.60 0
2018-11-01 Multi-Stage Fracture 3251.70 3251.80 0
2018-11-01 Multi-Stage Fracture 3198.90 3199.00 0
2018-11-01 Multi-Stage Fracture 3146.10 3146.20 0
2018-10-30 Multi-Stage Fracture 4517.30 4517.40 0
2018-10-30 Multi-Stage Fracture 4464.70 4464.80 0
2018-10-31 Multi-Stage Fracture 4411.90 4412.00 0
2018-10-31 Multi-Stage Fracture 4359.10 4359.20 0
2018-10-31 Multi-Stage Fracture 4306.30 4306.40 0
2018-10-31 Multi-Stage Fracture 4253.40 4253.50 0
2018-10-31 Multi-Stage Fracture 4200.60 4200.70 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-30 2018-11-01 3,005 7,192 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.1889 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.4537 N/A
silica crystalline 14808-60-7 100 3.4537 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.4163 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7539 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.01 N/A
dibromoacetonitrile 3252-43-5 100 0.01 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
polyethylene glycol 25322-68-3 100 0.01 N/A
sodium bromide 7647-15-6 100 0.01 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0892 N/A
water Not Available 100 0.0891 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0471 N/A
non-hazardous ingredients Not Available 100 0.0471 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0407 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0407 N/A
methanol 67-56-1 100 0.0407 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0407 N/A
non-hazardous ingredients Not Available 100 0.0407 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-25 2018-10-31 Recycled Fracturing Water (treated at well site) 2160
2018-10-25 2018-11-01 Recycled Fracturing Water (treated at well site) 1290
2018-11-29 2018-11-30 Recycled Fracturing Water (treated at well site) 1705
2018-10-29 2018-11-03 Surface Water - River 2037

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1295 0.0 0.0 0.0
2019 8749 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-20 No Incident Encountered 0.00 0.00
2018-11-16 No Incident Encountered 0.00 0.00

For data sources see[9]

References