If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0575250409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.921149,"lon":-117.649701,"icon":""}]} |
Location: 00/09-04-057-25W5/0 | |
Location Alias: 00/09-04-57-25 W5M | |
Location Alias 2: 00/09-04-057-25 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 5 | |
Range: 25 | |
Section: 04 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE HZ WILD RIV 9-4-57-25 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0490188 | |
License Date: 2018-07-25 | |
License Status: Issued | |
Spud Date: 2018-08-27 | |
Final Drill Date: 2018-10-02 | |
Well Total Depth: 5389.00 m | |
Surface Hole Latitude: 53.921149 | |
Surface Hole Longitude: -117.649701 |
Date | Event |
---|---|
2018-07-25 | Obtained License |
2018-08-28 | Surface Casing Operation Performed |
2018-09-03 | Intermediate Casing Operation Performed |
2018-09-25 | Direction Drilling Operation Performed - Deviate |
2018-09-28 | Direction Drilling Operation Performed - Horizontal |
2018-09-28 | Well Log Performed |
2018-10-02 | Finished Drilling |
2018-10-02 | Well Log Performed |
2018-10-02 | Well Mode changed to Drilled and Cased |
2018-10-03 | Well Log Performed |
2018-10-05 | Production Casing Operation Performed |
2018-10-05 | Rig Released |
2018-10-12 | Well Log Performed |
2018-10-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-20 | Well Began Production |
2018-10-20 | Well Fluid changed to Gas |
2018-10-20 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-09-22 | Trinidad Drilling Ltd. | 39E | N/A | Resumption |
2018-08-27 | Trinidad Drilling Ltd. | 39 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-09-25 | 2810.80 | Deviate (5 - 79 degrees) |
2018-09-28 | 3165.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-18 | Multi-Stage Fracture | 5327.10 | 5327.20 | 0 |
2018-10-18 | Multi-Stage Fracture | 4760.00 | 4760.10 | 0 |
2018-10-18 | Multi-Stage Fracture | 4694.30 | 4694.40 | 0 |
2018-10-18 | Multi-Stage Fracture | 4628.70 | 4628.80 | 0 |
2018-10-18 | Multi-Stage Fracture | 4563.00 | 4563.10 | 0 |
2018-10-18 | Multi-Stage Fracture | 4497.40 | 4497.50 | 0 |
2018-10-19 | Multi-Stage Fracture | 4431.70 | 4431.80 | 0 |
2018-10-19 | Multi-Stage Fracture | 4366.10 | 4366.20 | 0 |
2018-10-19 | Multi-Stage Fracture | 4300.50 | 4300.60 | 0 |
2018-10-19 | Multi-Stage Fracture | 4234.80 | 4234.90 | 0 |
2018-10-19 | Multi-Stage Fracture | 4169.20 | 4169.30 | 0 |
2018-10-18 | Multi-Stage Fracture | 5285.20 | 5285.30 | 0 |
2018-10-19 | Multi-Stage Fracture | 4103.60 | 4103.70 | 0 |
2018-10-19 | Multi-Stage Fracture | 4038.00 | 4038.10 | 0 |
2018-10-19 | Multi-Stage Fracture | 3972.30 | 3972.40 | 0 |
2018-10-19 | Multi-Stage Fracture | 3906.70 | 3906.80 | 0 |
2018-10-19 | Multi-Stage Fracture | 3841.10 | 3841.20 | 0 |
2018-10-19 | Multi-Stage Fracture | 3775.50 | 3775.60 | 0 |
2018-10-19 | Multi-Stage Fracture | 3709.90 | 3710.00 | 0 |
2018-10-19 | Multi-Stage Fracture | 3644.20 | 3644.30 | 0 |
2018-10-19 | Multi-Stage Fracture | 3578.60 | 3578.70 | 0 |
2018-10-19 | Multi-Stage Fracture | 3513.00 | 3514.20 | 0 |
2018-10-18 | Multi-Stage Fracture | 5219.60 | 5219.70 | 0 |
2018-10-19 | Multi-Stage Fracture | 3447.30 | 3448.60 | 0 |
2018-10-19 | Multi-Stage Fracture | 3381.80 | 3383.00 | 0 |
2018-10-19 | Multi-Stage Fracture | 3316.20 | 3317.40 | 0 |
2018-10-19 | Multi-Stage Fracture | 3250.60 | 3251.80 | 0 |
2018-10-19 | Multi-Stage Fracture | 3210.40 | 3211.60 | 0 |
2018-10-18 | Multi-Stage Fracture | 5153.90 | 5154.00 | 0 |
2018-10-18 | Multi-Stage Fracture | 5088.20 | 5088.30 | 0 |
2018-10-18 | Multi-Stage Fracture | 5022.60 | 5022.70 | 0 |
2018-10-18 | Multi-Stage Fracture | 4956.90 | 4957.00 | 0 |
2018-10-18 | Multi-Stage Fracture | 4891.30 | 4891.40 | 0 |
2018-10-18 | Multi-Stage Fracture | 4852.60 | 4852.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-18 | 2018-10-19 | 3,088 | 8,202 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 82.529 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.4572 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.4572 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 12.068 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.7628 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0098 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0098 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0098 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0098 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0098 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0881 | N/A | |
water | Not Available | 100 | 0.0881 | N/A | ||||
FR-22 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0445 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0445 | N/A | ||||
S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0402 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0402 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0402 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0402 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0402 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-10-14 | 2018-10-19 | Surface Water - River | 7100 |
2018-10-18 | 2018-10-19 | Recycled Fracturing Water (treated at well site) | 1102 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 1631 | 0.0 | 0.0 | 0.0 |
2019 | 8728 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-10-02 | No Incident Encountered | 0.00 | 0.00 |
2018-10-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]