X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575232902002

Well Details

Well ID: 0575232902002
Loading map...
Location: 00/02-29-057-23W5/2
Location Alias: 00/02-29-57-23 W5M
Location Alias 2: 00/02-29-057-23 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 23
Section: 29
County/Municipality: Yellowhead County
Well Name: TALISMAN WILD RIV 2-29-57-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0202472
License Date: 1997-06-12
License Status: Issued
Spud Date: 1997-06-19
Final Drill Date: 1997-08-20
Well Total Depth: 3760.00 m
Surface Hole Latitude: 53.949899
Surface Hole Longitude: -117.381702

For data sources see[1][2]

Well History

Date Event
1997-06-12 Obtained License
1997-06-19 Lost Circulation Occurred
1997-06-22 Surface Casing Operation Performed
1997-07-30 Well Log Performed
1997-08-02 Intermediate Casing Operation Performed
1997-08-02 Lost Circulation Occurred
1997-08-20 Finished Drilling
1997-08-20 Well Log Performed
1997-08-20 Well Mode changed to Drilled and Cased
1997-08-22 Well Log Performed
1997-08-24 Plug Back Performed
1997-08-24 Well Log Performed
1997-08-26 Rig Released
2000-11-04 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-11-04 Perforation Treatment Performed - Jet Perforation
2000-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-05 Perforation Treatment Performed - Remedial Casing
2000-11-14 Well Abandoned
2004-10-24 Perforation Treatment Performed - Jet Perforation
2004-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-03 Perforation Treatment Performed - Remedial Casing
2004-11-11 Perforation Treatment Performed - Jet Perforation
2004-11-11 Well Log Performed
2004-11-12 Perforation Treatment Performed - Fractured
2004-12-01 Well Began Production
2004-12-01 Well Fluid changed to Gas
2004-12-01 Well Mode changed to Flowing
2009-09-01 Well Fluid changed to Gas
2009-09-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-11-04 Perforation 622.00 624.00 17
2004-11-12 Fracture 2919.00 2923.00 0
2000-11-04 Bridge Plug, No Cement 612.00 612.80 0
2000-11-05 Remedial Casing Cementing 622.00 624.00 0
2000-11-05 Packing Device Capped w/Cement 540.00 612.00 0
2004-10-24 Perforation 622.00 624.00 13
2004-10-29 Acid Treatment 622.00 624.00 0
2004-11-02 Acid Treatment 622.00 624.00 0
2004-11-03 Remedial Casing Cementing 622.00 624.00 0
2004-11-11 Perforation 2919.00 2923.00 16

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 744 0.0 0.0 0.0
2005 8626 0.0 0.0 0.0
2006 8707 0.0 0.0 0.0
2007 8698 0.0 0.0 0.0
2008 8671 0.0 0.0 0.0
2009 8743 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8615 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8423 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8637 0.0 0.0 0.0
2016 7922 0.0 0.0 0.0
2017 8309 0.0 0.0 0.0
2018 5768 0.0 0.0 0.0
2019 7849 0.0 0.0 0.0
2020 1727 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-06-19 Lost Circulation 50.00 157.00
1997-08-02 Lost Circulation 3321.00 3321.00

For data sources see[6]

References