X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575201214000

Well Details

Well ID: 0575201214000
Loading map...
Location: 00/14-12-057-20W5/0
Location Alias: 00/14-12-57-20 W5M
Location Alias 2: 00/14-12-057-20 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 20
Section: 12
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 14-12-57-20
Operator Name: Paramount Resources Ltd.
License Number: 0147454
License Date: 1991-01-17
License Status: Issued
Spud Date: 1991-02-21
Final Drill Date: 1991-03-16
Well Total Depth: 2915.00 m
Surface Hole Latitude: 53.915914
Surface Hole Longitude: -116.839074

For data sources see[1][2]

Well History

Date Event
1991-01-17 Obtained License
1991-02-21 Well Log Performed
1991-02-24 Surface Casing Operation Performed
1991-03-16 Finished Drilling
1991-03-16 Well Mode changed to Drilled and Cased
1991-03-17 Well Log Performed
1991-03-18 Well Log Performed
1991-03-20 Production Casing Operation Performed
1991-03-21 Rig Released
1991-07-16 Well Log Performed
1991-08-12 Perforation Treatment Performed - Jet Perforation
1991-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-15 Plug Back Performed
1991-08-20 Perforation Treatment Performed - Jet Perforation
1991-08-21 Perforation Treatment Performed - Fractured
1991-09-30 Well Began Production
1991-09-30 Well Fluid changed to Gas
1991-09-30 Well Mode changed to Flowing
1991-10-01 Well Fluid changed to Gas
1991-10-01 Well Mode changed to Suspended
1994-06-13 Well Log Performed
1994-06-14 Perforation Treatment Performed - Jet Perforation
1994-06-18 Perforation Treatment Performed - Fractured
1994-07-27 Well Fluid changed to Gas
1994-07-27 Well Mode changed to Suspended
1994-09-05 Well Fluid changed to Gas
1994-09-05 Well Mode changed to Flowing
1996-06-16 Well Fluid changed to Gas
1996-06-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-08-12 Perforation 2800.00 2806.00 13
1991-08-15 Packing Device Capped w/Cement 2784.00 2793.00 0
1991-08-20 Perforation 2742.50 2758.00 13
1991-08-21 Fracture 2742.50 2758.00 0
1994-06-14 Perforation 2662.00 2682.00 13
1994-06-18 Fracture 2662.00 2682.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 24 0.0 0.0 0.0
1994 2639 0.0 0.0 0.0
1995 4532 0.0 0.0 0.0
1996 5427 0.0 0.0 0.0
1997 8319 0.0 0.0 0.0
1998 7969 0.0 0.0 0.0
1999 8362 0.0 0.0 0.0
2000 8268 0.0 0.0 0.0
2001 8404 0.0 0.0 0.0
2002 8619 0.0 0.0 0.0
2003 8610 0.0 0.0 0.0
2004 8469 0.0 0.0 0.0
2005 8703 0.0 0.0 0.0
2006 8181 0.0 0.0 0.0
2007 8545 0.0 0.0 0.0
2008 8757 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8519 0.0 0.0 0.0
2011 7301 0.0 0.0 0.0
2012 7668 0.0 0.0 0.0
2013 7101 0.0 0.0 0.0
2014 7180 0.0 0.0 0.0
2015 8177 0.0 0.0 0.0
2016 7871 0.0 0.0 0.0
2017 8470 0.0 0.0 0.0
2018 8066 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 1447 0.0 0.0 0.0

For data sources see[5]

References