If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0575201212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.902315,"lon":-116.872515,"icon":""}]} |
| Location: 00/12-12-057-20W5/0 | |
| Location Alias: 00/12-12-57-20 W5M | |
| Location Alias 2: 00/12-12-057-20 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 057 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 12 | |
| County/Municipality: Yellowhead County | |
| Well Name: ACL ET AL HZ PINE CK 12-12-57-20 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0449913 | |
| License Date: 2012-11-08 | |
| License Status: Amended | |
| Spud Date: 2012-11-25 | |
| Final Drill Date: 2013-01-07 | |
| Well Total Depth: 4996.00 m | |
| Surface Hole Latitude: 53.902315 | |
| Surface Hole Longitude: -116.872515 |
| Date | Event |
|---|---|
| 2012-11-08 | Obtained License |
| 2012-11-25 | Well Log Performed |
| 2012-11-28 | Surface Casing Operation Performed |
| 2012-12-05 | Direction Drilling Operation Performed - Deviate |
| 2012-12-16 | Intermediate Casing Operation Performed |
| 2012-12-19 | Direction Drilling Operation Performed - Horizontal |
| 2012-12-19 | Well Log Performed |
| 2013-01-07 | Finished Drilling |
| 2013-01-07 | Perforation Treatment Performed - Jet Perforation |
| 2013-01-07 | Perforation Treatment Performed - Remedial Casing |
| 2013-01-07 | Well Log Performed |
| 2013-01-07 | Well Mode changed to Drilled and Cased |
| 2013-01-10 | Liner Casing Operation Performed |
| 2013-01-10 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-01-12 | Rig Released |
| 2013-03-26 | Well Log Performed |
| 2013-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-07-01 | Well Fluid changed to Gas |
| 2013-07-01 | Well Mode changed to Testing |
| 2013-07-09 | Well Fluid changed to Gas |
| 2013-07-09 | Well Mode changed to Test Completed |
| 2013-07-25 | Well Began Production |
| 2013-07-25 | Well Fluid changed to Gas |
| 2013-07-25 | Well Mode changed to Flowing |
| 2017-03-07 | Well Fluid changed to Gas |
| 2017-03-07 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-12-05 | 2401.00 | Deviate (5 - 79 degrees) |
| 2012-12-19 | 3055.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-01-07 | Perforation | 80.00 | 81.00 | 13 |
| 2013-06-27 | Multi-Stage Fracture | 4260.20 | 4260.30 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4129.10 | 4129.20 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 4009.80 | 4009.90 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3891.40 | 3891.50 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3742.40 | 3742.50 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3594.80 | 3594.90 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3445.70 | 3445.80 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3297.40 | 3297.50 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3151.10 | 3151.20 | 0 |
| 2013-06-28 | Multi-Stage Fracture | 3061.40 | 3061.50 | 0 |
| 2013-01-07 | Remedial Casing Cementing | 80.00 | 81.00 | 0 |
| 2013-01-10 | Open Hole/Barefoot Completion | 4980.00 | 4996.00 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4975.00 | 4975.10 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4853.90 | 4854.00 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4734.00 | 4734.10 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4615.00 | 4615.10 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4498.30 | 4498.40 | 0 |
| 2013-06-27 | Multi-Stage Fracture | 4379.40 | 4379.50 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-06-27 | 2013-06-28 | 2,784 | 984 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Nitrogen | 7727-37-9 | 100 | 29.0118 | N/A | |||
| Water | Not Available | 100 | 41.7734 | N/A | ||||
| 100 Mesh | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.6365 | N/A | ||
| 20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 27.1614 | N/A | ||
| CG-2BL | Sanjel | Breaker | Magnesium Oxide | 1309-48-4 | 100 | 0.0424 | N/A | |
| Non-Hazardous Ingredients | Not Available | 100 | 0.0424 | N/A | ||||
| BUFFER-A | Sanjel | Buffer | Acetic Acid | 64-19-7 | 100 | 0.0853 | N/A | |
| Water | Not Available | 100 | 0.0853 | N/A | ||||
| CG-5 | Sanjel | Surfactant | Amines. C14-18; C16-18-Unsat. Alkyl. Ethoxylated | 68155-39-5 | 100 | 1.2888 | N/A | |
| Ethanol. 2. 2'-(Octadecylamino) bis- | 10213-78-2 | 100 | 1.2888 | N/A | ||||
| Hydrochloric Acid | 7647-01-0 | 100 | 1.2889 | N/A | ||||
| Isopropanol | 67-63-0 | 100 | 1.2888 | N/A | ||||
| Sodium xylenesulfonate | 1300-72-7 | 100 | 1.2889 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-01-11 | 2013-06-23 | Surface Water - River | 803 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 3753 | 0.0 | 0.0 | 0.0 |
| 2014 | 7969 | 0.0 | 0.0 | 0.0 |
| 2015 | 8158 | 0.0 | 0.0 | 0.0 |
| 2016 | 7533 | 0.0 | 0.0 | 0.0 |
| 2017 | 6465 | 0.0 | 0.0 | 0.0 |
| 2018 | 3598 | 0.0 | 0.0 | 0.0 |
| 2019 | 5124 | 0.0 | 0.0 | 0.0 |
| 2020 | 1896 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-01-12 | No Incident Encountered | 0.00 | 0.00 |
| 2013-07-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]