If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0575191010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.913826,"lon":-116.736202,"icon":""}]} |
Location: 00/10-10-057-19W5/0 | |
Location Alias: 00/10-10-57-19 W5M | |
Location Alias 2: 00/10-10-057-19 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 057 | |
Meridian: 5 | |
Range: 19 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: ACL PINE CK 10-10-57-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0018790 | |
License Date: 1960-03-01 | |
License Status: Issued | |
Spud Date: 1960-03-07 | |
Final Drill Date: 1960-06-10 | |
Well Total Depth: 3550.90 m | |
Surface Hole Latitude: 53.913826 | |
Surface Hole Longitude: -116.736202 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-03-01 | Obtained License |
1960-03-19 | Drill Stem Test Performed |
1960-05-11 | Drill Stem Test Performed |
1960-06-05 | Liner Casing Operation Performed |
1960-06-10 | Finished Drilling |
1960-06-10 | Perforation Treatment Performed - Open-Hole Completion |
1960-06-12 | Well Mode changed to Drilled and Cased |
1960-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-12-03 | Perforation Treatment Performed - Cement Squeeze |
1960-12-08 | Perforation Treatment Performed - Bullet Perforation |
1960-12-10 | Perforation Treatment Performed - Cement Squeeze |
1960-12-11 | Perforation Treatment Performed - Jet Perforation |
1961-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-09-07 | Perforation Treatment Performed - Cement Squeeze |
1961-09-10 | Perforation Treatment Performed - Cement Squeeze |
1961-09-29 | Perforation Treatment Performed - Open-Hole Completion |
1961-09-30 | Perforation Treatment Performed - Acid Wash - No Pressure |
1961-10-02 | Well Mode changed to Drilled and Cased |
1961-12-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-06-06 | Well Began Injection |
1962-06-06 | Well Fluid changed to Water |
1962-06-06 | Well Type changed to Disposal |
1965-10-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1965-10-07 | Well Fluid changed to Water |
1965-10-07 | Well Mode changed to Abandoned Zone |
1965-10-07 | Well Type changed to Disposal |
1965-10-23 | Perforation Treatment Performed - Acid Wash - No Pressure |
1965-10-23 | Perforation Treatment Performed - Jet Perforation |
1965-10-24 | Perforation Treatment Performed - Nitrogen Treatment |
1985-08-24 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-06-10 | Open Hole/Barefoot Completion | 3429.00 | 3450.00 | 0 |
1960-12-11 | Perforation | 3437.50 | 3439.10 | 13 |
1961-01-20 | Acid Treatment | 3430.20 | 3439.10 | 0 |
1961-09-07 | Cement Squeeze | 3430.20 | 3439.10 | 0 |
1961-09-10 | Cement Squeeze | 3430.20 | 3439.10 | 0 |
1961-09-29 | Open Hole/Barefoot Completion | 3473.20 | 3550.90 | 0 |
1961-09-30 | Acid Wash | 3473.20 | 3550.90 | 0 |
1961-12-05 | Acid Treatment | 3473.20 | 3550.90 | 0 |
1965-10-07 | Packing Device Capped w/Cement | 3201.90 | 3201.90 | 0 |
1965-10-23 | Perforation | 3165.00 | 3179.10 | 7 |
1965-10-23 | Acid Wash | 3165.00 | 3179.10 | 0 |
1960-10-22 | Acid Treatment | 3429.00 | 3450.00 | 0 |
1965-10-24 | Nitrogen Treatment | 3165.00 | 3179.10 | 0 |
1960-10-23 | Acid Treatment | 3429.00 | 3450.00 | 0 |
1960-12-03 | Cement Squeeze | 3429.00 | 3450.00 | 0 |
1960-12-08 | Bullet Perforation | 3445.20 | 3445.50 | 13 |
1960-12-10 | Cement Squeeze | 3445.20 | 3445.50 | 0 |
1960-12-11 | Perforation | 3430.20 | 3431.40 | 13 |
1960-12-11 | Perforation | 3432.70 | 3433.60 | 13 |
1960-12-11 | Perforation | 3434.50 | 3435.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]