X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575191010000

Well Details

Well ID: 0575191010000
Loading map...
Location: 00/10-10-057-19W5/0
Location Alias: 00/10-10-57-19 W5M
Location Alias 2: 00/10-10-057-19 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 19
Section: 10
County/Municipality: Yellowhead County
Well Name: ACL PINE CK 10-10-57-19
Operator Name: Paramount Resources Ltd.
License Number: 0018790
License Date: 1960-03-01
License Status: Issued
Spud Date: 1960-03-07
Final Drill Date: 1960-06-10
Well Total Depth: 3550.90 m
Surface Hole Latitude: 53.913826
Surface Hole Longitude: -116.736202

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-03-01 Obtained License
1960-03-19 Drill Stem Test Performed
1960-05-11 Drill Stem Test Performed
1960-06-05 Liner Casing Operation Performed
1960-06-10 Finished Drilling
1960-06-10 Perforation Treatment Performed - Open-Hole Completion
1960-06-12 Well Mode changed to Drilled and Cased
1960-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-03 Perforation Treatment Performed - Cement Squeeze
1960-12-08 Perforation Treatment Performed - Bullet Perforation
1960-12-10 Perforation Treatment Performed - Cement Squeeze
1960-12-11 Perforation Treatment Performed - Jet Perforation
1961-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-07 Perforation Treatment Performed - Cement Squeeze
1961-09-10 Perforation Treatment Performed - Cement Squeeze
1961-09-29 Perforation Treatment Performed - Open-Hole Completion
1961-09-30 Perforation Treatment Performed - Acid Wash - No Pressure
1961-10-02 Well Mode changed to Drilled and Cased
1961-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-06 Well Began Injection
1962-06-06 Well Fluid changed to Water
1962-06-06 Well Type changed to Disposal
1965-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1965-10-07 Well Fluid changed to Water
1965-10-07 Well Mode changed to Abandoned Zone
1965-10-07 Well Type changed to Disposal
1965-10-23 Perforation Treatment Performed - Acid Wash - No Pressure
1965-10-23 Perforation Treatment Performed - Jet Perforation
1965-10-24 Perforation Treatment Performed - Nitrogen Treatment
1985-08-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-06-10 Open Hole/Barefoot Completion 3429.00 3450.00 0
1960-12-11 Perforation 3437.50 3439.10 13
1961-01-20 Acid Treatment 3430.20 3439.10 0
1961-09-07 Cement Squeeze 3430.20 3439.10 0
1961-09-10 Cement Squeeze 3430.20 3439.10 0
1961-09-29 Open Hole/Barefoot Completion 3473.20 3550.90 0
1961-09-30 Acid Wash 3473.20 3550.90 0
1961-12-05 Acid Treatment 3473.20 3550.90 0
1965-10-07 Packing Device Capped w/Cement 3201.90 3201.90 0
1965-10-23 Perforation 3165.00 3179.10 7
1965-10-23 Acid Wash 3165.00 3179.10 0
1960-10-22 Acid Treatment 3429.00 3450.00 0
1965-10-24 Nitrogen Treatment 3165.00 3179.10 0
1960-10-23 Acid Treatment 3429.00 3450.00 0
1960-12-03 Cement Squeeze 3429.00 3450.00 0
1960-12-08 Bullet Perforation 3445.20 3445.50 13
1960-12-10 Cement Squeeze 3445.20 3445.50 0
1960-12-11 Perforation 3430.20 3431.40 13
1960-12-11 Perforation 3432.70 3433.60 13
1960-12-11 Perforation 3434.50 3435.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References