X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575182006000

Well Details

Well ID: 0575182006000
Loading map...
Location: 00/06-20-057-18W5/0
Location Alias: 00/06-20-57-18 W5M
Location Alias 2: 00/06-20-057-18 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 18
Section: 20
County/Municipality: Yellowhead County
Well Name: PRECAM ET AL PINE CREEK 6-20-57-18
Operator Name: Enerplus Corporation
License Number: 0137232
License Date: 1988-10-28
License Status: Issued
Spud Date: 1988-11-08
Final Drill Date: 1988-11-27
Well Total Depth: 2593.00 m
Surface Hole Latitude: 53.938086
Surface Hole Longitude: -116.645614

For data sources see[1][2]

Well History

Date Event
1988-10-28 Obtained License
1988-11-10 Surface Casing Operation Performed
1988-11-25 Drill Stem Test Performed
1988-11-27 Finished Drilling
1988-11-28 Well Log Performed
1988-11-29 Drill Stem Test Performed
1988-11-30 Drill Stem Test Performed
1988-12-01 Drill Stem Test Performed
1988-12-02 Production Casing Operation Performed
1988-12-02 Rig Released
1989-01-12 Well Log Performed
1989-01-14 Perforation Treatment Performed - Jet Perforation
1989-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-17 Plug Back Performed
1989-01-19 Perforation Treatment Performed - Jet Perforation
1989-02-15 Well Log Performed
1989-02-16 Perforation Treatment Performed - Jet Perforation
1989-02-19 Perforation Treatment Performed - Fractured
1989-03-01 Well Mode changed to Drilled and Cased
1990-03-01 Well Mode changed to Drilled and Cased

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-01-14 Perforation 2575.00 2577.00 13
1989-01-15 Acid Treatment 2575.00 2577.00 0
1989-01-17 Packing Device Capped w/Cement 2562.00 2570.00 0
1989-01-19 Perforation 2477.00 2478.50 13
1989-01-19 Perforation 2481.00 2482.00 13
1989-01-19 Perforation 2488.00 2490.00 13
1989-02-16 Perforation 2451.00 2459.00 13
1989-02-19 Fracture 2451.00 2459.00 0

For data sources see[4]



References