X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575181513000

Well Details

Well ID: 0575181513000
Loading map...
Location: 00/13-15-057-18W5/0
Location Alias: 00/13-15-57-18 W5M
Location Alias 2: 00/13-15-057-18 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 18
Section: 15
County/Municipality: Yellowhead County
Well Name: ENERPLUS OG PINE 13-15-57-18
Operator Name: Enerplus Corporation
License Number: 0176516
License Date: 1995-02-28
License Status: Issued
Spud Date: 1995-03-07
Final Drill Date: 1995-03-31
Well Total Depth: 2715.00 m
Surface Hole Latitude: 53.932150
Surface Hole Longitude: -116.593028

For data sources see[1][2]

Well History

Date Event
1995-02-28 Obtained License
1995-03-09 Surface Casing Operation Performed
1995-03-15 Direction Drilling Operation Performed - Deviate
1995-03-31 Finished Drilling
1995-03-31 Well Mode changed to Drilled and Cased
1995-04-01 Well Log Performed
1995-04-03 Production Casing Operation Performed
1995-04-04 Rig Released
1995-04-04 Well Log Performed
1995-06-20 Well Log Performed
1995-06-24 Perforation Treatment Performed - Jet Perforation
1995-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-01 Perforation Treatment Performed - Fractured
1995-07-01 Perforation Treatment Performed - Jet Perforation
1995-07-01 Plug Back Performed
1995-07-10 Perforation Treatment Performed - Fractured
1996-05-14 Well Began Production
1996-05-14 Well Fluid changed to Gas
1996-05-14 Well Mode changed to Flowing
1996-11-07 Well Fluid changed to Gas
1996-11-07 Well Mode changed to Closed
1996-12-03 Well Fluid changed to Gas
1996-12-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-03-15 1894.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-24 Perforation 2690.00 2694.00 20
1995-07-01 Packing Device Capped w/Cement 2678.00 2686.00 0
1995-07-01 Perforation 2637.00 2646.00 14
1995-07-01 Fracture 2641.00 2645.00 0
1995-07-10 Fracture 2637.00 2646.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5463 0.0 0.0 0.0
1997 8622 0.0 0.0 0.0
1998 8493 0.0 0.0 0.0
1999 8535 0.0 0.0 0.0
2000 8556 0.0 0.0 0.0
2001 8705 0.0 0.0 0.0
2002 7992 0.0 0.0 0.0
2003 8179 0.0 0.0 0.0
2004 8366 0.0 0.0 0.0
2005 8399 0.0 0.0 0.0
2006 8692 0.0 0.0 0.0
2007 8124 0.0 0.0 0.0
2008 8772 0.0 0.0 0.0
2009 8531 0.0 0.0 0.0
2010 7935 0.0 0.0 0.0
2011 8652 0.0 0.0 0.0
2012 8653 0.0 0.0 0.0
2013 8593 0.0 0.0 0.0
2014 8663 0.0 0.0 0.0
2015 8694 0.0 0.0 0.0
2016 8687 0.0 0.0 0.0
2017 8455 0.0 0.0 0.0
2018 8496 0.0 0.0 0.0
2019 8084 0.0 0.0 0.0
2020 1787 0.0 0.0 0.0

For data sources see[6]

References