X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575081910000

Well Details

Well ID: 0575081910000
Loading map...
Location: 00/10-19-057-08W5/0
Location Alias: 00/10-19-57-08 W5M
Location Alias 2: 00/10-19-057-08 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 08
Section: 19
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 10-19-57-8
Operator Name: Point Loma Resources Ltd.
License Number: 0063716
License Date: 1977-05-05
License Status: Suspension
Spud Date: 1977-06-02
Final Drill Date: 1977-06-11
Well Total Depth: 1520.30 m
Surface Hole Latitude: 53.943316
Surface Hole Longitude: -115.174898

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-05 Obtained License
1977-06-11 Drill Stem Test Performed
1977-06-11 Finished Drilling
1977-06-11 Well Mode changed to Drilled and Cased
1977-06-12 Drill Stem Test Performed
1977-06-13 Production Casing Operation Performed
1977-09-02 Perforation Treatment Performed - Jet Perforation
1977-09-03 Perforation Treatment Performed - Jet Perforation
1977-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-11 Perforation Treatment Performed - Jet Perforation
1977-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-10 Well Began Production
1977-11-10 Well Fluid changed to Gas
1977-11-10 Well Mode changed to Flowing
1994-05-31 Well Fluid changed to Gas
1994-05-31 Well Mode changed to Suspended
2007-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-09 Plug Back Performed
2007-11-09 Well Fluid changed to Gas
2007-11-09 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-02 Perforation 1509.70 1510.60 7
1977-09-03 Perforation 1505.40 1506.30 7
1977-09-08 Acid Treatment 1505.40 1510.60 0
1977-09-11 Perforation 1488.60 1490.50 7
1977-09-11 Perforation 1492.30 1495.30 7
1977-09-12 Acid Treatment 1488.60 1495.30 0
2007-11-09 Packing Device Capped w/Cement 1494.00 1502.00 0
2007-11-09 Packing Device Capped w/Cement 1472.00 1480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1070 0.0 0.0 0.0
1978 8137 0.0 0.0 0.0
1979 8717 0.0 0.0 0.0
1980 8411 0.0 0.0 0.0
1981 8710 0.0 0.0 0.0
1982 7996 0.0 0.0 0.0
1983 7912 0.0 0.0 0.0
1984 8324 0.0 0.0 0.0
1985 8647 0.0 0.0 0.0
1986 8544 0.0 0.0 0.0
1987 8649 0.0 0.0 0.0
1988 8508 0.0 0.0 0.0
1989 8706 0.0 0.0 0.0
1990 8634 0.0 0.0 0.0
1991 8733 0.0 0.0 0.0
1992 8624 0.0 0.0 0.0
1993 7759 0.0 0.0 0.0
1994 1005 0.0 0.0 0.0

For data sources see[5]

References