X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575053510000

Well Details

Well ID: 0575053510000
Loading map...
Location: 00/10-35-057-05W5/0
Location Alias: 00/10-35-57-05 W5M
Location Alias 2: 00/10-35-057-05 W5/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 05
Section: 35
County/Municipality: County of Barrhead No. 11
Well Name: AMOCO BARRHEAD 10-35-57-5
Operator Name: Crescent Point General Partner Corp.
License Number: 0035514
License Date: 1968-12-27
License Status: Re-Entered
Spud Date: 1969-01-04
Final Drill Date: 1969-01-14
Well Total Depth: 1271.00 m
Surface Hole Latitude: 53.973224
Surface Hole Longitude: -114.628572

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-12-27 Obtained License
1969-01-14 Drill Stem Test Performed
1969-01-14 Finished Drilling
1969-01-15 Drill Stem Test Performed
1969-01-16 Drill Stem Test Performed
1969-01-18 Production Casing Operation Performed
1970-02-16 Well Mode changed to Drilled and Cased
1999-09-13 Perforation Treatment Performed - Jet Perforation
2000-01-21 Well Began Production
2000-01-21 Well Fluid changed to Gas
2000-01-21 Well Mode changed to Flowing
2000-04-30 Well Fluid changed to Gas
2000-04-30 Well Mode changed to Suspended
2000-11-01 Well Fluid changed to Gas
2000-11-01 Well Mode changed to Flowing
2001-09-01 Well Fluid changed to Gas
2001-09-01 Well Mode changed to Suspended
2001-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-17 Perforation Treatment Performed - Jet Perforation
2001-10-17 Plug Back Performed
2001-10-17 Well Log Performed
2001-10-19 Perforation Treatment Performed - Remedial Casing
2001-10-19 Well Fluid changed to Gas
2001-10-19 Well Log Performed
2001-10-19 Well Mode changed to Abandoned Zone
2001-10-20 Well Abandoned
2001-10-20 Well Fluid changed to Gas
2001-10-20 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-13 Perforation 1216.70 1218.80 14
2001-10-17 Packing Device Capped w/Cement 1216.70 1218.80 0
2001-10-17 Perforation 183.00 183.60 72
2001-10-19 Remedial Casing Cementing 183.00 183.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1368 0.0 0.0 0.0
2001 6342 0.0 0.0 0.0

For data sources see[5]

References