X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0575030402002

Well Details

Well ID: 0575030402002
Loading map...
Location: 00/02-04-057-03W5/2
Location Alias: 00/02-04-57-03 W5M
Location Alias 2: 00/02-04-057-03 W5/02
Country: Canada
Province: Alberta
Township: 057
Meridian: 5
Range: 03
Section: 04
County/Municipality: Lac Ste. Anne County
Well Name: LONG RUN MAJEAU 2-4-57-3
Operator Name: Long Run Exploration Ltd.
License Number: 0088356
License Date: 1981-01-19
License Status: Suspension
Spud Date: 1981-01-24
Final Drill Date: 1981-01-31
Well Total Depth: 1365.00 m
Surface Hole Latitude: 53.893799
Surface Hole Longitude: -114.380482

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-19 Obtained License
1981-01-31 Finished Drilling
1981-02-01 Drill Stem Test Performed
1981-02-02 Drill Stem Test Performed
1981-02-04 Production Casing Operation Performed
1981-03-12 Perforation Treatment Performed - Jet Perforation
1981-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-14 Perforation Treatment Performed - Jet Perforation
1981-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-16 Perforation Treatment Performed - Cement Squeeze
1981-03-17 Perforation Treatment Performed - Jet Perforation
1981-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-11 Perforation Treatment Performed - Chemical Squeeze
1981-11-01 Well Mode changed to Drilled and Cased
1981-11-05 Perforation Treatment Performed - Jet Perforation
1982-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-10 Perforation Treatment Performed - Jet Perforation
1982-06-10 Well Mode changed to Drilled and Cased
1982-06-11 Perforation Treatment Performed - Cement Squeeze
1982-06-12 Perforation Treatment Performed - Jet Perforation
1982-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-14 Perforation Treatment Performed - Jet Perforation
1982-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-16 Perforation Treatment Performed - Jet Perforation
1982-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-30 Well Log Performed
1985-07-01 Perforation Treatment Performed - Jet Perforation
1985-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-06 Well Mode changed to Drilled and Cased
2001-06-01 Perforation Treatment Performed - Chemical Squeeze
2001-06-01 Perforation Treatment Performed - Jet Perforation
2001-06-01 Well Log Performed
2004-12-29 Well Began Production
2004-12-29 Well Fluid changed to Gas
2004-12-29 Well Mode changed to Flowing
2005-07-18 Perforation Treatment Performed - Casing Patch (Over Perfs)
2007-03-28 Perforation Treatment Performed - Jet Perforation
2007-03-29 Well Fluid changed to Gas
2007-03-29 Well Mode changed to Flowing
2009-04-01 Well Fluid changed to Gas
2009-04-01 Well Mode changed to Pumping
2019-10-31 Well Fluid changed to Gas
2019-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-03-12 Perforation 1332.50 1333.00 13
1981-07-11 Chemical Squeeze 1328.50 1329.50 0
1981-11-05 Perforation 1182.00 1184.00 7
1982-06-10 Packing Device Capped w/Cement 1226.00 1236.00 0
1982-06-10 Perforation 1192.00 1193.00 5
1982-06-10 Perforation 1175.00 1177.00 5
1982-06-11 Cement Squeeze 1175.00 1193.00 0
1982-06-12 Perforation 1182.00 1183.00 14
1982-06-14 Acid Treatment 1182.00 1183.00 0
1982-06-14 Perforation 1183.00 1184.00 14
1982-06-15 Acid Treatment 1182.00 1184.00 0
1981-03-12 Perforation 1334.50 1335.00 13
1982-06-16 Perforation 1184.00 1184.50 14
1982-06-17 Acid Treatment 1182.00 1184.50 0
1985-07-01 Perforation 1216.00 1218.00 13
1985-07-03 Acid Treatment 1216.00 1218.00 0
2001-06-01 Perforation 1182.00 1184.50 13
2001-06-01 Chemical Squeeze 1182.00 1184.50 0
2001-06-01 Perforation 1216.00 1218.10 13
2005-07-18 Casing Patch 1182.00 1184.50 0
2007-03-28 Perforation 1182.00 1184.50 14
1981-03-12 Perforation 1336.00 1336.50 13
1981-03-13 Acid Treatment 1332.50 1336.50 0
1981-03-14 Perforation 1328.50 1330.50 7
1981-03-15 Acid Treatment 1328.50 1330.50 0
1981-03-16 Cement Squeeze 1328.50 1336.50 0
1981-03-17 Perforation 1328.50 1329.50 7
1981-03-18 Acid Treatment 1328.50 1329.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 6567 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8682 0.0 0.0 0.0
2011 8738 0.0 0.0 0.0
2012 8661 0.0 0.0 0.0
2013 8700 0.0 0.0 0.0
2014 8697 0.0 0.0 0.0
2015 8568 0.0 0.0 0.0
2016 8741 0.0 0.0 0.0
2017 6599 0.0 0.0 0.0

For data sources see[5]

References