X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574240810003

Well Details

Well ID: 0574240810003
Loading map...
Location: 00/10-08-057-24W4/3
Location Alias: 00/10-08-57-24 W4M
Location Alias 2: 00/10-08-057-24 W4/03
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 24
Section: 08
County/Municipality: Sturgeon County
Well Name: DORSET FAIRYDELL 10-8-57-24
Operator Name: Baytex Energy Ltd.
License Number: 0007050
License Date: 1953-09-14
License Status: Suspension
Spud Date: 1953-09-24
Final Drill Date: 1953-11-01
Well Total Depth: 1239.90 m
Surface Hole Latitude: 53.914565
Surface Hole Longitude: -113.530481

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-09-14 Obtained License
1953-09-29 Drill Stem Test Performed
1953-09-30 Drill Stem Test Performed
1953-10-01 Drill Stem Test Performed
1953-10-02 Drill Stem Test Performed
1953-10-03 Drill Stem Test Performed
1953-10-04 Drill Stem Test Performed
1953-10-05 Drill Stem Test Performed
1953-10-07 Drill Stem Test Performed
1953-10-08 Drill Stem Test Performed
1953-10-10 Drill Stem Test Performed
1953-10-11 Drill Stem Test Performed
1953-10-12 Drill Stem Test Performed
1953-10-13 Drill Stem Test Performed
1953-10-14 Drill Stem Test Performed
1953-10-15 Drill Stem Test Performed
1953-10-16 Drill Stem Test Performed
1953-10-18 Drill Stem Test Performed
1953-10-21 Drill Stem Test Performed
1953-10-24 Drill Stem Test Performed
1953-10-25 Drill Stem Test Performed
1953-10-28 Drill Stem Test Performed
1953-10-29 Production Casing Operation Performed
1953-11-01 Finished Drilling
1953-11-01 Well Mode changed to Drilled and Cased
1953-11-02 Drill Stem Test Performed
1953-11-05 Perforation Treatment Performed - Open-Hole Completion
1953-11-06 Perforation Treatment Performed - Acid Wash - No Pressure
1983-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-07-14 Well Log Performed
1983-07-15 Perforation Treatment Performed - Jet Perforation
1983-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-14 Well Log Performed
1992-12-01 Perforation Treatment Performed - Jet Perforation
1992-12-01 Well Log Performed
2000-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-28 Plug Back Performed
2000-01-30 Perforation Treatment Performed - Jet Perforation
2000-01-30 Well Mode changed to Drilled and Cased
2000-02-01 Well Began Production
2000-02-01 Well Fluid changed to Gas
2000-02-01 Well Mode changed to Flowing
2008-10-01 Well Fluid changed to Gas
2008-10-01 Well Mode changed to Suspended
2016-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-05 Open Hole/Barefoot Completion 1231.40 1236.30 0
2000-01-28 Packing Device Capped w/Cement 1022.00 1030.00 0
2000-01-30 Perforation 917.50 921.10 13
2016-02-03 Packing Device Capped w/Cement 906.00 914.00 0
1953-11-06 Acid Wash 1231.40 1236.30 0
1983-07-14 Packing Device Capped w/Cement 1191.00 1205.00 0
1983-07-15 Perforation 1050.00 1051.80 7
1983-07-18 Acid Treatment 1050.00 1051.80 0
1992-12-01 Perforation 1040.50 1041.50 13
1992-12-01 Perforation 1042.50 1044.00 13
1992-12-01 Perforation 1045.00 1046.00 13
1992-12-01 Perforation 1048.00 1050.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 6619 0.0 0.0 0.0
2001 6161 0.0 0.0 0.0
2002 8677 0.0 0.0 0.0
2003 8539 0.0 0.0 0.0
2004 6451 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References