X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574212208000

Well Details

Well ID: 0574212208000
Loading map...
Location: 00/08-22-057-21W4/0
Location Alias: 00/08-22-57-21 W4M
Location Alias 2: 00/08-22-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 22
County/Municipality: Sturgeon County
Well Name: IMPERIAL REDWATER NO. 52 WELL,
Operator Name: Imperial Oil Limited
License Number: 0000730
License Date: 1949-10-11
License Status: RecCertified
Spud Date: 1949-10-15
Final Drill Date: 1949-10-27
Well Total Depth: 994.30 m
Surface Hole Latitude: 53.940149
Surface Hole Longitude: -113.028661

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-10-11 Obtained License
1949-10-24 Production Casing Operation Performed
1949-10-26 Drill Stem Test Performed
1949-10-27 Finished Drilling
1949-10-27 Perforation Treatment Performed - Open-Hole Completion
1949-10-27 Well Mode changed to Drilled and Cased
1949-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-10-31 Well Began Production
1949-10-31 Well Fluid changed to Crude Oil
1949-10-31 Well Mode changed to Flowing
1949-11-14 Perforation Treatment Performed - Cement Plug
1949-11-14 Perforation Treatment Performed - Open-Hole Completion
1949-11-16 Perforation Treatment Performed - Acid Wash - No Pressure
1949-11-21 Perforation Treatment Performed - Cement Plug
1949-11-22 Perforation Treatment Performed - Open-Hole Completion
1949-11-23 Perforation Treatment Performed - Bullet Perforation
1949-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1950-03-14 Well Fluid changed to Crude Oil
1950-03-14 Well Mode changed to Pumping
1953-07-28 Perforation Treatment Performed - Open-Hole Completion
1953-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-19 Perforation Treatment Performed - Open-Hole Completion
1963-06-19 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1963-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-24 Perforation Treatment Performed - Bullet Perforation
1967-07-14 Perforation Treatment Performed - Cement Plug
1967-07-16 Well Abandoned
1967-07-16 Well Fluid changed to Crude Oil
1967-07-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-10-27 Open Hole/Barefoot Completion 982.40 994.30 0
1949-11-24 Acid Wash 982.40 985.40 0
1953-07-28 Open Hole/Barefoot Completion 982.40 989.70 0
1953-07-30 Acid Treatment 982.40 989.70 0
1963-06-19 Resin-Gypsum Squeeze or Plug 983.30 989.70 0
1963-06-19 Open Hole/Barefoot Completion 982.40 983.30 0
1963-06-24 Bullet Perforation 983.00 983.30 3
1963-06-24 Acid Treatment 983.00 983.30 0
1967-07-14 Cement Plug 915.90 982.40 0
1949-10-28 Acid Treatment 982.40 994.30 0
1949-10-30 Acid Treatment 982.40 994.30 0
1949-11-14 Cement Plug 991.20 994.30 0
1949-11-14 Open Hole/Barefoot Completion 982.40 991.20 0
1949-11-16 Acid Wash 979.00 984.50 0
1949-11-21 Cement Plug 986.90 991.20 0
1949-11-22 Open Hole/Barefoot Completion 982.40 986.90 0
1949-11-23 Bullet Perforation 979.30 985.40 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References