X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211916000

Well Details

Well ID: 0574211916000
Loading map...
Location: 00/16-19-057-21W4/0
Location Alias: 00/16-19-57-21 W4M
Location Alias 2: 00/16-19-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 19
County/Municipality: Redwater
Well Name: W. SHKOLNY NO. 16
Operator Name: Gulf Canada Limited
License Number: B0002831
License Date: 1949-05-09
License Status: RecCertified
Spud Date: 1949-05-17
Final Drill Date: 1949-06-03
Well Total Depth: 1003.70 m
Surface Hole Latitude: 53.946920
Surface Hole Longitude: -113.102953

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-05-09 Obtained License
1949-05-28 Production Casing Operation Performed
1949-06-03 Finished Drilling
1949-06-03 Perforation Treatment Performed - Open-Hole Completion
1949-06-03 Well Mode changed to Drilled and Cased
1949-06-08 Well Began Production
1949-06-08 Well Fluid changed to Crude Oil
1949-06-08 Well Mode changed to Flowing
1950-06-07 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-19 Well Fluid changed to Crude Oil
1950-07-19 Well Mode changed to Pumping
1972-06-16 Perforation Treatment Performed - Cement Plug
1972-06-16 Perforation Treatment Performed - Open-Hole Completion
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
1995-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-16 Perforation Treatment Performed - Jet Perforation
1995-02-16 Plug Back Performed
1995-02-16 Well Log Performed
1995-04-27 Perforation Treatment Performed - Remedial Casing
1995-04-27 Well Fluid changed to Crude Oil
1995-04-27 Well Mode changed to Abandoned
1995-04-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-06-03 Open Hole/Barefoot Completion 980.80 1003.70 0
1950-06-07 Acid Wash 980.80 1003.70 0
1972-06-16 Cement Plug 990.90 1002.20 0
1972-06-16 Open Hole/Barefoot Completion 980.80 990.90 0
1995-02-16 Packing Device Capped w/Cement 967.00 975.00 0
1995-02-16 Perforation 212.00 213.00 13
1995-04-27 Remedial Casing Cementing 212.00 213.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 2928 0.0 0.0 0.0
1973 8319 0.0 0.0 0.0
1974 8423 0.0 0.0 0.0
1975 8501 0.0 0.0 0.0
1976 8609 0.0 0.0 0.0
1977 4526 0.0 0.0 0.0
1978 8489 0.0 0.0 0.0
1979 8230 0.0 0.0 0.0
1980 8115 0.0 0.0 0.0
1981 8507 0.0 0.0 0.0
1982 8503 0.0 0.0 0.0
1983 8707 0.0 0.0 0.0
1984 8389 0.0 0.0 0.0
1985 8235 0.0 0.0 0.0
1986 8606 0.0 0.0 0.0
1987 8712 0.0 0.0 0.0
1988 8422 0.0 0.0 0.0
1989 8440 0.0 0.0 0.0
1990 8482 0.0 0.0 0.0
1991 8730 0.0 0.0 0.0
1992 6727 0.0 0.0 0.0
1993 8732 0.0 0.0 0.0
1994 6646 0.0 0.0 0.0

For data sources see[5]

References