X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574211413000

Well Details

Well ID: 0574211413000
Loading map...
Location: 00/13-14-057-21W4/0
Location Alias: 00/13-14-57-21 W4M
Location Alias 2: 00/13-14-057-21 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 21
Section: 14
County/Municipality: Sturgeon County
Well Name: IMPERIAL AMELIA NO. 2 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0000392
License Date: 1949-07-27
License Status: RecCertified
Spud Date: 1949-08-10
Final Drill Date: 1949-08-25
Well Total Depth: 999.10 m
Surface Hole Latitude: 53.932636
Surface Hole Longitude: -113.022209

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-07-27 Obtained License
1949-08-20 Production Casing Operation Performed
1949-08-25 Drill Stem Test Performed
1949-08-25 Finished Drilling
1949-08-25 Perforation Treatment Performed - Open-Hole Completion
1949-08-25 Well Mode changed to Drilled and Cased
1949-08-26 Perforation Treatment Performed - Acid Wash - No Pressure
1949-08-27 Well Began Production
1949-08-27 Well Fluid changed to Crude Oil
1949-08-27 Well Mode changed to Flowing
1949-09-27 Perforation Treatment Performed - Cement Squeeze
1949-10-03 Perforation Treatment Performed - Jet Perforation
1949-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1950-05-24 Well Fluid changed to Crude Oil
1950-05-24 Well Mode changed to Pumping
1966-08-28 Perforation Treatment Performed - Cement Plug
1966-09-01 Well Abandoned
1966-09-01 Well Fluid changed to Crude Oil
1966-09-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-08-25 Open Hole/Barefoot Completion 979.00 999.10 0
1949-08-26 Acid Wash 979.00 999.10 0
1949-09-27 Cement Squeeze 979.00 999.10 0
1949-10-03 Perforation 979.90 983.00 7
1949-10-03 Perforation 983.00 991.20 3
1949-10-08 Acid Treatment 979.90 991.20 0
1949-10-13 Acid Wash 979.90 991.20 0
1966-08-28 Cement Plug 927.80 993.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References