X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0574132606000

Well Details

Well ID: 0574132606000
Loading map...
Location: 00/06-26-057-13W4/0
Location Alias: 00/06-26-57-13 W4M
Location Alias 2: 00/06-26-057-13 W4/00
Country: Canada
Province: Alberta
Township: 057
Meridian: 4
Range: 13
Section: 26
County/Municipality: Saddle Lake 125
Well Name: ALTANA SADDLE LK 6-26-57-13
Operator Name: Altana Exploration Company
License Number: 0039236
License Date: 1970-11-27
License Status: RecExempt
Spud Date: 1970-11-30
Final Drill Date: 1970-12-05
Well Total Depth: 688.50 m
Surface Hole Latitude: 53.952682
Surface Hole Longitude: -111.827892

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-11-27 Obtained License
1970-12-04 Drill Stem Test Performed
1970-12-05 Finished Drilling
1970-12-06 Production Casing Operation Performed
1970-12-07 Well Mode changed to Drilled and Cased
1975-09-04 Perforation Treatment Performed - Jet Perforation
1977-12-04 Perforation Treatment Performed - Jet Perforation
1993-09-15 Perforation Treatment Performed - Cement Plug
1993-09-15 Perforation Treatment Performed - Open-Hole Completion
1993-09-15 Plug Back Performed
1994-11-01 Perforation Treatment Performed - Jet Perforation
1994-11-01 Well Log Performed
1994-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-02 Well Log Performed
1994-11-05 Well Fluid changed to Gas
1994-11-05 Well Mode changed to Testing
1994-11-06 Perforation Treatment Performed - Remedial Casing
1994-11-06 Well Fluid changed to Gas
1994-11-06 Well Mode changed to Abandoned
1995-07-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-04 Perforation 516.90 518.20 13
1994-11-06 Remedial Casing Cementing 217.00 217.30 0
1977-12-04 Perforation 603.20 604.70 13
1993-09-15 Open Hole/Barefoot Completion 633.40 688.50 0
1993-09-15 Cement Plug 405.00 687.40 0
1994-11-01 Perforation 330.00 330.30 17
1994-11-01 Perforation 250.00 250.30 17
1994-11-01 Perforation 217.00 217.30 17
1994-11-02 Packing Device Capped w/Cement 317.00 325.00 0
1994-11-02 Packing Device Capped w/Cement 239.00 247.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 665 0.0 0.0 0.0

For data sources see[5]

References