X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565263516000

Well Details

Well ID: 0565263516000
Loading map...
Location: 00/16-35-056-26W5/0
Location Alias: 00/16-35-56-26 W5M
Location Alias 2: 00/16-35-056-26 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 26
Section: 35
County/Municipality: Yellowhead County
Well Name: TOURMALINE WILD RIV 16-35-56-26
Operator Name: Tourmaline Oil Corp.
License Number: 0407403
License Date: 2009-01-07
License Status: Issued
Spud Date: 2009-02-16
Final Drill Date: 2009-03-15
Well Total Depth: 3411.00 m
Surface Hole Latitude: 53.887072
Surface Hole Longitude: -117.746540

For data sources see[1][2]

Well History

Date Event
2009-01-07 Obtained License
2009-02-17 Lost Circulation Occurred
2009-02-20 Surface Casing Operation Performed
2009-02-23 Lost Circulation Occurred
2009-03-02 Well Log Performed
2009-03-04 Intermediate Casing Operation Performed
2009-03-15 Finished Drilling
2009-03-15 Well Log Performed
2009-03-15 Well Mode changed to Drilled and Cased
2009-03-16 Production Casing Operation Performed
2009-03-17 Rig Released
2009-08-18 Perforation Treatment Performed - Jet Perforation
2009-08-18 Well Log Performed
2009-08-19 Perforation Treatment Performed - Fractured
2009-08-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-22 Perforation Treatment Performed - Fractured
2009-08-23 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-23 Perforation Treatment Performed - Fractured
2009-08-24 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-24 Perforation Treatment Performed - Fractured
2009-08-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-27 Perforation Treatment Performed - Fractured
2009-08-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-28 Perforation Treatment Performed - Fractured
2009-08-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-08-29 Perforation Treatment Performed - Fractured
2009-10-09 Well Began Production
2009-10-09 Well Fluid changed to Gas
2009-10-09 Well Mode changed to Flowing
2014-08-01 Well Fluid changed to Gas
2014-08-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-08-18 Perforation 3384.30 3385.00 20
2009-08-23 Fracture 3321.50 3330.60 0
2009-08-23 Hydra Jet Perforation 3262.00 3262.10 3
2009-08-23 Hydra Jet Perforation 3255.50 3255.60 3
2009-08-23 Hydra Jet Perforation 3252.00 3252.10 3
2009-08-23 Fracture 3252.00 3262.10 0
2009-08-23 Hydra Jet Perforation 3222.50 3222.60 3
2009-08-23 Hydra Jet Perforation 3218.50 3218.60 3
2009-08-23 Hydra Jet Perforation 3215.50 3215.60 3
2009-08-24 Fracture 3215.50 3222.60 0
2009-08-24 Hydra Jet Perforation 3200.50 3200.60 3
2009-08-18 Perforation 3379.00 3379.80 20
2009-08-24 Hydra Jet Perforation 3190.50 3190.60 3
2009-08-24 Fracture 3190.50 3200.60 0
2009-08-26 Hydra Jet Perforation 3176.50 3176.60 3
2009-08-26 Hydra Jet Perforation 3169.50 3169.60 3
2009-08-27 Fracture 3169.50 3176.60 0
2009-08-27 Hydra Jet Perforation 3059.50 3059.60 3
2009-08-27 Hydra Jet Perforation 3055.50 3055.60 3
2009-08-27 Fracture 3055.50 3059.60 0
2009-08-27 Hydra Jet Perforation 3031.40 3031.50 3
2009-08-27 Fracture 3031.40 3031.50 0
2009-08-19 Fracture 3379.00 3385.00 0
2009-08-27 Hydra Jet Perforation 2990.50 2990.60 3
2009-08-28 Hydra Jet Perforation 2987.50 2987.60 3
2009-08-28 Fracture 2987.50 2990.60 0
2009-08-28 Hydra Jet Perforation 2863.00 2863.10 3
2009-08-28 Hydra Jet Perforation 2857.50 2857.60 3
2009-08-28 Fracture 2857.50 2863.10 0
2009-08-29 Hydra Jet Perforation 2442.50 2442.60 3
2009-08-29 Hydra Jet Perforation 2437.50 2437.60 3
2009-08-29 Hydra Jet Perforation 2433.50 2433.60 3
2009-08-29 Fracture 2433.50 2442.60 0
2009-08-21 Hydra Jet Perforation 3364.50 3364.60 3
2009-08-21 Hydra Jet Perforation 3349.50 3349.60 3
2009-08-22 Fracture 3349.50 3364.60 0
2009-08-23 Hydra Jet Perforation 3330.50 3330.60 3
2009-08-23 Hydra Jet Perforation 3325.50 3325.60 3
2009-08-23 Hydra Jet Perforation 3321.50 3321.60 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 1939 0.0 0.0 0.0
2010 8480 0.0 0.0 0.0
2011 7807 0.0 0.0 0.0
2012 8541 0.0 0.0 0.0
2013 8663 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8640 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7129 0.0 0.0 0.0
2018 4178 0.0 0.0 0.0
2019 8524 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-02-17 Lost Circulation 112.00 614.00
2009-02-23 Lost Circulation 1031.00 2150.00

For data sources see[6]

References