X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565263203003

Well Details

Well ID: 0565263203003
Loading map...
Location: 00/03-32-056-26W5/3
Location Alias: 00/03-32-56-26 W5M
Location Alias 2: 00/03-32-056-26 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 26
Section: 32
County/Municipality: Yellowhead County
Well Name: TOURMALINE WILD RIV 3-32-56-26
Operator Name: Tourmaline Oil Corp.
License Number: 0407373
License Date: 2009-01-07
License Status: Issued
Spud Date: 2009-01-20
Final Drill Date: 2009-02-08
Well Total Depth: 3415.00 m
Surface Hole Latitude: 53.878000
Surface Hole Longitude: -117.833861

For data sources see[1][2]

Well History

Date Event
2009-01-07 Obtained License
2009-01-23 Surface Casing Operation Performed
2009-02-08 Finished Drilling
2009-02-08 Well Mode changed to Drilled and Cased
2009-02-09 Well Log Performed
2009-02-11 Production Casing Operation Performed
2009-02-12 Rig Released
2009-02-27 Perforation Treatment Performed - Jet Perforation
2009-02-28 Perforation Treatment Performed - Fractured
2009-03-02 Perforation Treatment Performed - Jet Perforation
2009-03-03 Perforation Treatment Performed - Fractured
2009-03-05 Perforation Treatment Performed - Jet Perforation
2009-03-06 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-27 Perforation 3364.00 3365.00 3
2009-03-02 Perforation 3198.50 3199.50 3
2009-03-02 Perforation 3259.00 3260.00 4
2009-03-02 Perforation 3223.00 3224.00 3
2009-03-03 Fracture 2992.00 2993.00 0
2009-03-03 Fracture 3259.00 3260.00 0
2009-03-03 Fracture 3113.00 3224.00 0
2009-03-05 Perforation 2430.00 2431.00 5
2009-03-05 Perforation 2421.00 2422.00 5
2009-03-05 Perforation 2870.00 2871.00 3
2009-03-05 Perforation 2844.50 2845.50 3
2009-02-27 Perforation 3326.50 3327.50 3
2009-03-06 Fracture 2421.00 2431.00 0
2009-03-06 Fracture 2844.50 2871.00 0
2009-02-27 Perforation 3375.00 3376.00 3
2009-02-27 Perforation 3390.00 3391.00 4
2009-02-28 Fracture 3326.50 3376.00 0
2009-02-28 Fracture 3390.00 3391.00 0
2009-03-02 Perforation 3155.00 3156.00 4
2009-03-02 Perforation 3113.00 3114.00 3
2009-03-02 Perforation 2992.00 2993.00 3

For data sources see[4]



References