X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565242701000

Well Details

Well ID: 0565242701000
Loading map...
Location: 00/01-27-056-24W5/0
Location Alias: 00/01-27-56-24 W5M
Location Alias 2: 00/01-27-056-24 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 24
Section: 27
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ WILD RIV 1-27-56-24
Operator Name: Tourmaline Oil Corp.
License Number: 0475378
License Date: 2015-05-04
License Status: Issued
Spud Date: 2015-09-12
Final Drill Date: 2015-09-28
Well Total Depth: 4091.00 m
Surface Hole Latitude: 53.863257
Surface Hole Longitude: -117.492069

For data sources see[1][2]

Well History

Date Event
2015-05-04 Obtained License
2015-09-13 Surface Casing Operation Performed
2015-09-17 Intermediate Casing Operation Performed
2015-09-19 Direction Drilling Operation Performed - Deviate
2015-09-23 Direction Drilling Operation Performed - Horizontal
2015-09-23 Well Log Performed
2015-09-28 Finished Drilling
2015-09-28 Well Log Performed
2015-09-28 Well Mode changed to Drilled and Cased
2015-10-01 Production Casing Operation Performed
2015-10-01 Rig Released
2015-10-10 Well Log Performed
2015-10-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-24 Well Fluid changed to Gas
2015-10-24 Well Mode changed to Testing
2015-11-01 Well Began Production
2015-11-01 Well Fluid changed to Gas
2015-11-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-12 Nabors Drilling Limited 79E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-19 2669.90 Deviate (5 - 79 degrees)
2015-09-23 3061.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-11 Multi-Stage Fracture 4075.70 4075.80 0
2015-10-22 Multi-Stage Fracture 3592.30 3592.40 0
2015-10-22 Multi-Stage Fracture 3539.60 3539.70 0
2015-10-23 Multi-Stage Fracture 3486.90 3487.00 0
2015-10-23 Multi-Stage Fracture 3434.30 3434.40 0
2015-10-23 Multi-Stage Fracture 3381.60 3381.70 0
2015-10-23 Multi-Stage Fracture 3328.90 3329.00 0
2015-10-23 Multi-Stage Fracture 3276.20 3276.30 0
2015-10-23 Multi-Stage Fracture 3223.50 3223.60 0
2015-10-23 Multi-Stage Fracture 3170.70 3170.80 0
2015-10-23 Multi-Stage Fracture 3118.00 3118.10 0
2015-10-11 Multi-Stage Fracture 4014.00 4014.10 0
2015-10-22 Multi-Stage Fracture 3961.30 3961.40 0
2015-10-22 Multi-Stage Fracture 3908.60 3908.70 0
2015-10-22 Multi-Stage Fracture 3855.90 3856.00 0
2015-10-22 Multi-Stage Fracture 3803.20 3803.30 0
2015-10-22 Multi-Stage Fracture 3750.40 3750.50 0
2015-10-22 Multi-Stage Fracture 3697.70 3697.80 0
2015-10-22 Multi-Stage Fracture 3645.00 3645.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-11 2015-10-23 2,926 5,525 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 86.2 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 4.091 N/A
silica crystalline 14808-60-7 100 4.091 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 7.9267 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.4042 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0109 N/A
dibromoacetonitrile 3252-43-5 100 0.0109 N/A
non-hazardous ingredients Not Available 100 0.0109 N/A
polyethylene glycol 25322-68-3 100 0.0109 N/A
sodium bromide 7647-15-6 100 0.0109 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1913 N/A
formic acid 64-18-6 100 0.1913 N/A
non-hazardous ingredients Not Available 100 0.1913 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0975 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0975 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0975 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0975 N/A
non-hazardous ingredients Not Available 100 0.0975 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.078 N/A
isopropanol 67-63-0 100 0.078 N/A
methanol 67-56-1 100 0.078 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.078 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.078 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-10-11 2015-10-21 Recycled Fracturing Water (treated at well site) 2169
2015-10-22 2015-10-22 Recycled Fracturing Water (treated at well site) 640
2015-10-23 2015-10-23 Recycled Fracturing Water (treated at well site) 1790
2015-10-21 2015-10-23 Surface Water - Lake 926

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1602 0.0 0.0 0.0
2016 8765 0.0 0.0 0.0
2017 8589 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-01 No Incident Encountered 0.00 0.00
2015-11-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References