If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565240401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.81792,"lon":-117.500333,"icon":""}]} |
Location: 00/01-04-056-24W5/0 | |
Location Alias: 00/01-04-56-24 W5M | |
Location Alias 2: 00/01-04-056-24 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 24 | |
Section: 04 | |
County/Municipality: Yellowhead County | |
Well Name: PEYTO WILD RIV 1-4-56-24 | |
Operator Name: Peyto Exploration & Development Corp. | |
License Number: 0493702 | |
License Date: 2019-02-06 | |
License Status: Issued | |
Spud Date: 2019-09-12 | |
Final Drill Date: 2019-09-20 | |
Well Total Depth: 3734.00 m | |
Surface Hole Latitude: 53.817920 | |
Surface Hole Longitude: -117.500333 |
Date | Event |
---|---|
2019-02-06 | Obtained License |
2019-09-12 | Direction Drilling Operation Performed - Deviate |
2019-09-12 | Drill To LD |
2019-09-12 | Surface Casing Operation Performed |
2019-09-15 | Direction Drilling Operation Performed - Horizontal |
2019-09-16 | Well Log Performed |
2019-09-20 | Finished Drilling |
2019-09-20 | Well Log Performed |
2019-09-20 | Well Mode changed to Drilled and Cased |
2019-09-21 | Liner Casing Operation Performed |
2019-09-21 | Perforation Treatment Performed - Open-Hole Completion |
2019-09-21 | Production Casing Operation Performed |
2019-09-22 | Rig Released |
2019-10-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-17 | Well Began Production |
2019-10-17 | Well Fluid changed to Gas |
2019-10-17 | Well Mode changed to Flowing |
2020-01-12 | Well Fluid changed to Gas |
2020-01-12 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-09-12 | Ensign Drilling Inc. | T432 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-09-12 | 470.00 | Deviate (5 - 79 degrees) |
2019-09-15 | 2466.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-09-21 | Open Hole/Barefoot Completion | 3717.00 | 3734.00 | 0 |
2019-10-04 | Multi-Stage Fracture | 3347.70 | 3347.80 | 0 |
2019-10-04 | Multi-Stage Fracture | 3307.50 | 3307.60 | 0 |
2019-10-04 | Multi-Stage Fracture | 3267.70 | 3267.80 | 0 |
2019-10-04 | Multi-Stage Fracture | 3228.00 | 3228.10 | 0 |
2019-10-04 | Multi-Stage Fracture | 3188.20 | 3188.30 | 0 |
2019-10-04 | Multi-Stage Fracture | 3149.20 | 3149.30 | 0 |
2019-10-04 | Multi-Stage Fracture | 3107.30 | 3107.40 | 0 |
2019-10-04 | Multi-Stage Fracture | 3066.80 | 3066.90 | 0 |
2019-10-04 | Multi-Stage Fracture | 3025.40 | 3025.50 | 0 |
2019-10-04 | Multi-Stage Fracture | 2984.10 | 2984.20 | 0 |
2019-10-04 | Multi-Stage Fracture | 3675.80 | 3675.90 | 0 |
2019-10-04 | Multi-Stage Fracture | 2943.50 | 2943.60 | 0 |
2019-10-04 | Multi-Stage Fracture | 2902.90 | 2903.00 | 0 |
2019-10-04 | Multi-Stage Fracture | 2864.60 | 2864.70 | 0 |
2019-10-04 | Multi-Stage Fracture | 2823.80 | 2823.90 | 0 |
2019-10-04 | Multi-Stage Fracture | 2782.30 | 2782.40 | 0 |
2019-10-04 | Multi-Stage Fracture | 2741.10 | 2741.20 | 0 |
2019-10-04 | Multi-Stage Fracture | 2699.70 | 2699.80 | 0 |
2019-10-04 | Multi-Stage Fracture | 2657.60 | 2657.70 | 0 |
2019-10-04 | Multi-Stage Fracture | 2616.20 | 2616.30 | 0 |
2019-10-04 | Multi-Stage Fracture | 2573.80 | 2573.90 | 0 |
2019-10-04 | Multi-Stage Fracture | 3633.80 | 3633.90 | 0 |
2019-10-04 | Multi-Stage Fracture | 2531.90 | 2532.00 | 0 |
2019-10-04 | Multi-Stage Fracture | 3593.30 | 3593.40 | 0 |
2019-10-04 | Multi-Stage Fracture | 3554.60 | 3554.70 | 0 |
2019-10-04 | Multi-Stage Fracture | 3512.90 | 3513.00 | 0 |
2019-10-04 | Multi-Stage Fracture | 3471.50 | 3471.60 | 0 |
2019-10-04 | Multi-Stage Fracture | 3429.50 | 3429.60 | 0 |
2019-10-04 | Multi-Stage Fracture | 3389.20 | 3389.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-10-04 | 2019-10-04 | 2,359 | 3,390 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 3.0024 | N/A | |||
water | Not Available | 100 | 82.453 | N/A | ||||
Sand - Tier 2 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 14.3622 | N/A | ||
Aqucar DB20 Biocide | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0392 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0392 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0392 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0392 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0392 | N/A | ||||
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0408 | N/A | |
FR-24 Concentrated Friction Reducer | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.0445 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0445 | N/A | ||||
GSI-1W Green Scale Inhibitor | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.018 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.018 | N/A | ||||
NMR-1N Surfactant | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0395 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0395 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-09-27 | 2019-10-07 | Groundwater - Non-saline less than or equal to 150m deep | 2583 |
2019-09-27 | 2019-09-27 | Recycled Fracturing Water (treated at well site) | 973 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1817 | 0.0 | 0.0 | 0.0 |
2020 | 2064 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-09-22 | No Incident Encountered | 0.00 | 0.00 |
2019-10-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]