X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565231611002

Well Details

Well ID: 0565231611002
Loading map...
Location: 00/11-16-056-23W5/2
Location Alias: 00/11-16-56-23 W5M
Location Alias 2: 00/11-16-056-23 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 23
Section: 16
County/Municipality: Yellowhead County
Well Name: TALISMAN WILDR 11-16-56-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0159561
License Date: 1993-06-30
License Status: Issued
Spud Date: 1993-07-23
Final Drill Date: 1993-10-03
Well Total Depth: 2985.00 m
Surface Hole Latitude: 53.840405
Surface Hole Longitude: -117.360001

For data sources see[1][2]

Well History

Date Event
1993-06-30 Obtained License
1993-07-26 Surface Casing Operation Performed
1993-09-08 Intermediate Casing Operation Performed
1993-10-01 Well Log Performed
1993-10-02 Liner Casing Operation Performed
1993-10-03 Finished Drilling
1993-10-03 Well Mode changed to Drilled and Cased
1993-10-04 Rig Released
1993-11-12 Well Log Performed
1993-11-16 Perforation Treatment Performed - Jet Perforation
1993-11-18 Perforation Treatment Performed - Fractured
1993-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-10 Perforation Treatment Performed - Jet Perforation
1996-12-10 Well Log Performed
1996-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-02 Well Structure changed to Commingled
2000-02-10 Perforation Treatment Performed - Jet Perforation
2000-02-10 Well Log Performed
2000-02-13 Perforation Treatment Performed - Fractured
2002-03-13 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-11-16 Perforation 2921.00 2926.00 13
1993-11-18 Fracture 2921.00 2926.00 0
1993-11-21 Acid Treatment 2921.00 2926.00 0
1996-12-10 Perforation 2865.00 2870.00 16
1996-12-14 Acid Treatment 2865.00 2870.00 0
2000-02-10 Perforation 2672.00 2675.50 20
2000-02-13 Fracture 2672.00 2675.50 0

For data sources see[4]



References