X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565231309000

Well Details

Well ID: 0565231309000
Loading map...
Location: 00/09-13-056-23W5/0
Location Alias: 00/09-13-56-23 W5M
Location Alias 2: 00/09-13-056-23 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 23
Section: 13
County/Municipality: Yellowhead County
Well Name: TALISMAN WILDR 9-13-56-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0339390
License Date: 2005-10-05
License Status: Issued
Spud Date: 2005-10-28
Final Drill Date: 2005-11-11
Well Total Depth: 3113.00 m
Surface Hole Latitude: 53.840317
Surface Hole Longitude: -117.277229

For data sources see[1][2]

Well History

Date Event
2005-10-05 Obtained License
2005-10-29 Surface Casing Operation Performed
2005-11-11 Finished Drilling
2005-11-11 Well Log Performed
2005-11-11 Well Mode changed to Drilled and Cased
2005-11-12 Production Casing Operation Performed
2005-11-12 Well Log Performed
2005-11-13 Rig Released
2005-11-30 Perforation Treatment Performed - Jet Perforation
2005-11-30 Well Log Performed
2005-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-12-04 Perforation Treatment Performed - Fractured
2005-12-08 Perforation Treatment Performed - Jet Perforation
2005-12-08 Well Log Performed
2005-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-12-09 Perforation Treatment Performed - Fractured
2006-01-13 Well Began Production
2006-01-13 Well Fluid changed to Gas
2006-01-13 Well Mode changed to Flowing
2009-09-01 Well Fluid changed to Gas
2009-09-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-30 Perforation 2965.00 2968.00 20
2005-12-04 Acid Treatment 2965.00 2968.00 0
2005-12-04 Fracture 2965.00 2968.00 0
2005-12-08 Perforation 2770.00 2774.00 20
2005-12-09 Acid Treatment 2770.00 2774.00 0
2005-12-09 Fracture 2770.00 2774.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 8450 0.0 0.0 0.0
2007 8716 0.0 0.0 0.0
2008 8743 0.0 0.0 0.0
2009 8747 0.0 0.0 0.0
2010 7685 0.0 0.0 0.0
2011 7732 0.0 0.0 0.0
2012 8766 0.0 0.0 0.0
2013 8519 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8159 0.0 0.0 0.0
2016 1464 0.0 0.0 0.0
2018 4048 0.0 0.0 0.0
2019 8454 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[5]

References