X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565230807002

Well Details

Well ID: 0565230807002
Loading map...
Location: 00/07-08-056-23W5/2
Location Alias: 00/07-08-56-23 W5M
Location Alias 2: 00/07-08-056-23 W5/02
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 23
Section: 08
County/Municipality: Yellowhead County
Well Name: TALISMAN ET AL WILDR 7-8-56-23
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0161503
License Date: 1993-10-13
License Status: Issued
Spud Date: 1993-11-14
Final Drill Date: 1994-01-01
Well Total Depth: 3116.00 m
Surface Hole Latitude: 53.821244
Surface Hole Longitude: -117.380942

For data sources see[1][2]

Well History

Date Event
1993-10-13 Obtained License
1993-11-21 Surface Casing Operation Performed
1993-12-04 Well Log Performed
1993-12-05 Drill Stem Test Performed
1993-12-06 Drill Stem Test Performed
1993-12-07 Drill Stem Test Performed
1993-12-22 Drill Stem Test Performed
1994-01-01 Finished Drilling
1994-01-01 Well Mode changed to Drilled and Cased
1994-01-05 Well Log Performed
1994-01-24 Intermediate Casing Operation Performed
1994-01-24 Liner Casing Operation Performed
1994-01-24 Rig Released
1994-01-28 Perforation Treatment Performed - Jet Perforation
1994-01-28 Well Log Performed
1994-01-29 Perforation Treatment Performed - Cement Squeeze
1994-02-01 Perforation Treatment Performed - Jet Perforation
1994-02-02 Perforation Treatment Performed - Fractured
1994-03-27 Well Log Performed
1994-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-29 Perforation Treatment Performed - Jet Perforation
1994-03-29 Plug Back Performed
1994-03-29 Well Log Performed
1994-03-30 Perforation Treatment Performed - Jet Perforation
1994-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-31 Perforation Treatment Performed - Cement Squeeze
1994-04-07 Well Log Performed
1994-04-08 Perforation Treatment Performed - Jet Perforation
1994-04-08 Well Log Performed
1994-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-14 Perforation Treatment Performed - Cement Squeeze
1994-04-17 Perforation Treatment Performed - Jet Perforation
1994-04-17 Well Log Performed
1994-04-20 Perforation Treatment Performed - Fractured
1999-09-16 Perforation Treatment Performed - Jet Perforation
1999-10-20 Well Began Production
1999-10-20 Well Fluid changed to Gas
1999-10-20 Well Mode changed to Flowing
2002-04-12 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-28 Perforation 3107.50 3108.50 13
1994-03-31 Cement Squeeze 2714.50 2761.50 0
1994-04-08 Perforation 2719.00 2720.00 13
1994-04-09 Acid Treatment 2719.00 2720.00 0
1994-04-14 Cement Squeeze 2719.00 2720.00 0
1994-04-17 Perforation 2735.50 2744.00 14
1994-04-20 Fracture 2735.50 2744.00 0
1999-09-16 Perforation 2964.40 2968.60 17
1994-01-28 Perforation 3074.00 3075.00 13
1994-01-29 Cement Squeeze 3074.00 3108.50 0
1994-02-01 Perforation 3091.00 3094.00 13
1994-02-02 Fracture 3091.00 3094.00 0
1994-03-29 Packing Device Capped w/Cement 3064.00 3072.00 0
1994-03-29 Perforation 2760.50 2761.50 13
1994-03-30 Perforation 2714.50 2715.50 13
1994-03-31 Acid Treatment 2760.50 2761.50 0

For data sources see[4]



References