X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565221708020

Well Details

Well ID: 0565221708020
Loading map...
Location: 02/08-17-056-22W5/0
Location Alias: 02/08-17-56-22 W5M
Location Alias 2: 02/08-17-056-22 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 22
Section: 17
County/Municipality: Yellowhead County
Well Name: ROGCI 02 HZ WILD RIV 8-17-56-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0478456
License Date: 2015-12-14
License Status: Amended
Spud Date: 2016-02-11
Final Drill Date: 2016-02-24
Well Total Depth: 4940.00 m
Surface Hole Latitude: 53.859847
Surface Hole Longitude: -117.224779

For data sources see[1][2]

Well History

Date Event
2015-12-14 Obtained License
2016-02-12 Surface Casing Operation Performed
2016-02-17 Direction Drilling Operation Performed - Deviate
2016-02-18 Direction Drilling Operation Performed - Horizontal
2016-02-19 Intermediate Casing Operation Performed
2016-02-19 Well Log Performed
2016-02-24 Finished Drilling
2016-02-24 Well Log Performed
2016-02-24 Well Mode changed to Drilled and Cased
2016-02-28 Production Casing Operation Performed
2016-02-29 Rig Released
2016-02-29 Well Log Performed
2016-03-01 Perforation Treatment Performed - Open-Hole Completion
2016-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-03 Well Fluid changed to Gas
2016-10-03 Well Mode changed to Testing
2016-11-04 Well Began Production
2016-11-04 Well Fluid changed to Gas
2016-11-04 Well Mode changed to Flowing
2019-12-13 Well Fluid changed to Gas
2019-12-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-02-17 2429.50 Deviate (5 - 79 degrees)
2016-02-18 2935.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-03-01 Open Hole/Barefoot Completion 4928.50 4940.00 0
2016-09-30 Multi-Stage Fracture 4248.00 4248.10 0
2016-10-01 Multi-Stage Fracture 4116.10 4116.20 0
2016-10-01 Multi-Stage Fracture 3928.00 3928.10 0
2016-10-01 Multi-Stage Fracture 3784.10 3784.20 0
2016-10-01 Multi-Stage Fracture 3705.90 3706.00 0
2016-10-01 Multi-Stage Fracture 3620.80 3620.90 0
2016-10-01 Multi-Stage Fracture 3542.80 3542.90 0
2016-10-01 Multi-Stage Fracture 3473.50 3473.60 0
2016-10-01 Multi-Stage Fracture 3391.40 3391.50 0
2016-10-01 Multi-Stage Fracture 3324.90 3325.00 0
2016-09-30 Multi-Stage Fracture 4907.00 4907.10 0
2016-10-01 Multi-Stage Fracture 3249.20 3249.30 0
2016-10-01 Multi-Stage Fracture 3167.20 3167.30 0
2016-10-01 Multi-Stage Fracture 3100.90 3101.00 0
2016-09-30 Multi-Stage Fracture 4826.10 4826.20 0
2016-09-30 Multi-Stage Fracture 4745.10 4745.20 0
2016-09-30 Multi-Stage Fracture 4661.80 4661.90 0
2016-09-30 Multi-Stage Fracture 4580.60 4580.70 0
2016-09-30 Multi-Stage Fracture 4497.00 4497.10 0
2016-09-30 Multi-Stage Fracture 4414.20 4414.30 0
2016-09-30 Multi-Stage Fracture 4331.70 4331.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-30 2016-10-01 2,820 6,248 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.5364 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 14.5219 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.2491 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0106 N/A
dibromoacetonitrile 3252-43-5 100 0.0106 N/A
non-hazardous ingredients Not Available 100 0.0106 N/A
polyethylene glycol 25322-68-3 100 0.0106 N/A
sodium bromide 7647-15-6 100 0.0106 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0334 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1599 N/A
non-hazardous ingredients Not Available 100 0.1599 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0111 N/A
propylene glycol 57-55-6 100 0.0111 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0299 N/A
PFC-2 Trican Surfactant aminofunctional polymer 9794 100 0.1598 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1598 N/A
distillates (petroleum). hydrotreated light paraffinic 64742-55-8 100 0.1598 N/A
ethanol 64-17-5 100 0.1598 N/A
silicon compound 1 9794 100 0.1598 N/A
silicon compound 2 9794 100 0.1598 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-07 2016-09-20 Groundwater - Non-saline less than or equal to 150m deep 3965
2016-09-07 2016-10-01 Groundwater - Non-saline less than or equal to 150m deep 3217

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1463 0.0 0.0 0.0
2017 8437 0.0 0.0 0.0
2018 7717 0.0 0.0 0.0
2019 8130 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-01 No Incident Encountered 0.00 0.00
2016-10-13 No Incident Encountered 0.00 0.00

For data sources see[9]

References