If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565213616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.892413,"lon":-116.979624,"icon":""}]} |
Location: 00/16-36-056-21W5/0 | |
Location Alias: 00/16-36-56-21 W5M | |
Location Alias 2: 00/16-36-056-21 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 21 | |
Section: 36 | |
County/Municipality: Yellowhead County | |
Well Name: TOURMALINE KAYBOBS 16-36-56-21 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0412325 | |
License Date: 2009-09-15 | |
License Status: Issued | |
Spud Date: 2009-10-09 | |
Final Drill Date: 2009-10-26 | |
Well Total Depth: 2866.00 m | |
Surface Hole Latitude: 53.892413 | |
Surface Hole Longitude: -116.979624 |
Date | Event |
---|---|
2009-09-15 | Obtained License |
2009-10-10 | Direction Drilling Operation Performed - Deviate |
2009-10-14 | Surface Casing Operation Performed |
2009-10-25 | Well Log Performed |
2009-10-26 | Finished Drilling |
2009-10-26 | Well Log Performed |
2009-10-26 | Well Mode changed to Drilled and Cased |
2009-10-27 | Production Casing Operation Performed |
2009-10-27 | Rig Released |
2009-11-26 | Perforation Treatment Performed - Fractured |
2009-11-26 | Perforation Treatment Performed - Jet Perforation |
2009-11-27 | Perforation Treatment Performed - Fractured |
2009-11-27 | Perforation Treatment Performed - Jet Perforation |
2009-11-28 | Perforation Treatment Performed - Jet Perforation |
2009-11-29 | Perforation Treatment Performed - Fractured |
2010-02-17 | Well Began Production |
2010-02-17 | Well Fluid changed to Gas |
2010-02-17 | Well Mode changed to Flowing |
2011-03-28 | Well Fluid changed to Gas |
2011-03-28 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-10-10 | 76.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-11-26 | Perforation | 2851.50 | 2852.50 | 10 |
2009-11-26 | Perforation | 2722.00 | 2722.60 | 10 |
2009-11-27 | Fracture | 2722.00 | 2831.30 | 0 |
2009-11-27 | Perforation | 2687.00 | 2687.60 | 10 |
2009-11-27 | Perforation | 2672.50 | 2673.10 | 10 |
2009-11-27 | Perforation | 2666.00 | 2666.60 | 10 |
2009-11-27 | Perforation | 2621.50 | 2622.10 | 10 |
2009-11-27 | Perforation | 2603.00 | 2603.60 | 10 |
2009-11-27 | Fracture | 2603.00 | 2687.60 | 0 |
2009-11-27 | Perforation | 2589.00 | 2589.60 | 10 |
2009-11-27 | Perforation | 2583.00 | 2583.60 | 10 |
2009-11-26 | Perforation | 2848.00 | 2849.00 | 10 |
2009-11-27 | Perforation | 2540.00 | 2540.30 | 10 |
2009-11-27 | Perforation | 2528.50 | 2528.80 | 10 |
2009-11-27 | Perforation | 2519.00 | 2519.60 | 10 |
2009-11-27 | Perforation | 2511.00 | 2511.30 | 10 |
2009-11-27 | Perforation | 2481.00 | 2481.30 | 10 |
2009-11-27 | Fracture | 2481.00 | 2589.60 | 0 |
2009-11-28 | Perforation | 2382.00 | 2383.00 | 10 |
2009-11-28 | Perforation | 2378.50 | 2379.50 | 10 |
2009-11-28 | Perforation | 2374.50 | 2375.50 | 10 |
2009-11-28 | Perforation | 2478.50 | 2479.50 | 10 |
2009-11-26 | Perforation | 2843.00 | 2844.00 | 10 |
2009-11-28 | Perforation | 2074.00 | 2075.00 | 10 |
2009-11-28 | Perforation | 2056.50 | 2057.50 | 10 |
2009-11-29 | Fracture | 2056.50 | 2383.00 | 0 |
2009-11-26 | Fracture | 2843.00 | 2852.50 | 0 |
2009-11-26 | Perforation | 2831.00 | 2831.30 | 10 |
2009-11-26 | Perforation | 2829.00 | 2829.60 | 10 |
2009-11-26 | Perforation | 2820.00 | 2820.60 | 10 |
2009-11-26 | Perforation | 2769.00 | 2769.60 | 10 |
2009-11-26 | Perforation | 2732.00 | 2732.30 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7355 | 0.0 | 0.0 | 0.0 |
2011 | 8446 | 0.0 | 0.0 | 0.0 |
2012 | 8305 | 0.0 | 0.0 | 0.0 |
2013 | 8190 | 0.0 | 0.0 | 0.0 |
2014 | 8662 | 0.0 | 0.0 | 0.0 |
2015 | 8653 | 0.0 | 0.0 | 0.0 |
2016 | 8571 | 0.0 | 0.0 | 0.0 |
2017 | 8584 | 0.0 | 0.0 | 0.0 |
2018 | 8735 | 0.0 | 0.0 | 0.0 |
2019 | 8615 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[6]