X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565202409003

Well Details

Well ID: 0565202409003
Loading map...
Location: 00/09-24-056-20W5/3
Location Alias: 00/09-24-56-20 W5M
Location Alias 2: 00/09-24-056-20 W5/03
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 20
Section: 24
County/Municipality: Yellowhead County
Well Name: BP ET AL PINE CREEK 9-24-56-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0147823
License Date: 1991-02-06
License Status: Re-Entered
Spud Date: 1991-02-09
Final Drill Date: 1995-11-29
Well Total Depth: 3768.00 m
Surface Hole Latitude: 53.854629
Surface Hole Longitude: -116.827590

For data sources see[1][2]

Well History

Date Event
1991-02-06 Obtained License
1991-02-12 Surface Casing Operation Performed
1991-04-18 Intermediate Casing Operation Performed
1991-05-14 Liner Casing Operation Performed
1995-10-18 Direction Drilling Operation Performed - Deviate
1995-11-09 Direction Drilling Operation Performed - Deviate
1995-11-16 Liner Casing Operation Performed
1995-11-23 Well Log Performed
1995-11-28 Well Log Performed
1995-11-29 Finished Drilling
1995-11-29 Perforation Treatment Performed - Open-Hole Completion
1995-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-04 Perforation Treatment Performed - Cement Plug
1995-12-04 Perforation Treatment Performed - Cement Squeeze
1995-12-04 Perforation Treatment Performed - Jet Perforation
1995-12-04 Plug Back Performed
1995-12-06 Rig Released
1995-12-06 Well Mode changed to Abandoned
1995-12-07 Well Mode changed to Abandoned and Re-entered
1995-12-08 Well Abandoned
1996-02-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-10-18 3329.00 Deviate (5 - 79 degrees)
1995-11-09 3624.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-29 Open Hole/Barefoot Completion 3761.00 3768.00 0
1995-12-04 Packing Device Capped w/Cement 3736.00 3744.00 0
1995-12-04 Perforation 650.00 656.00 13
1995-12-04 Cement Squeeze 650.00 656.00 0
1995-12-04 Cement Plug 585.30 667.30 0

For data sources see[5]



References