If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0565192502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.864715,"lon":-116.686843,"icon":""}]} |
| Location: 00/02-25-056-19W5/0 | |
| Location Alias: 00/02-25-56-19 W5M | |
| Location Alias 2: 00/02-25-056-19 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 5 | |
| Range: 19 | |
| Section: 25 | |
| County/Municipality: Yellowhead County | |
| Well Name: BEC PINE CK 2-25-56-19 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0264107 | |
| License Date: 2001-12-14 | |
| License Status: Suspension | |
| Spud Date: 2002-01-05 | |
| Final Drill Date: 2002-01-19 | |
| Well Total Depth: 2790.00 m | |
| Surface Hole Latitude: 53.864715 | |
| Surface Hole Longitude: -116.686843 |
| Date | Event |
|---|---|
| 2001-12-14 | Obtained License |
| 2002-01-09 | Surface Casing Operation Performed |
| 2002-01-19 | Finished Drilling |
| 2002-01-19 | Well Log Performed |
| 2002-01-21 | Well Log Performed |
| 2002-01-23 | Well Log Performed |
| 2002-01-24 | Drill Stem Test Performed |
| 2002-01-24 | Well Log Performed |
| 2002-01-27 | Production Casing Operation Performed |
| 2002-01-27 | Rig Released |
| 2002-01-27 | Well Mode changed to Drilled and Cased |
| 2002-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2002-02-12 | Well Log Performed |
| 2002-02-14 | Perforation Treatment Performed - Fractured |
| 2004-07-31 | Well Began Production |
| 2004-07-31 | Well Fluid changed to Gas |
| 2004-07-31 | Well Mode changed to Pumping |
| 2014-10-01 | Well Fluid changed to Gas |
| 2014-10-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2002-02-12 | Perforation | 2720.00 | 2725.00 | 20 |
| 2002-02-14 | Fracture | 2720.00 | 2725.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 3666 | 0.0 | 0.0 | 0.0 |
| 2005 | 8639 | 0.0 | 0.0 | 0.0 |
| 2006 | 8004 | 0.0 | 0.0 | 0.0 |
| 2007 | 8648 | 0.0 | 0.0 | 0.0 |
| 2008 | 8711 | 0.0 | 0.0 | 0.0 |
| 2009 | 8200 | 0.0 | 0.0 | 0.0 |
| 2010 | 8619 | 0.0 | 0.0 | 0.0 |
| 2011 | 8666 | 0.0 | 0.0 | 0.0 |
| 2012 | 8510 | 0.0 | 0.0 | 0.0 |
| 2013 | 3623 | 0.0 | 0.0 | 0.0 |
For data sources see[5]