If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565191310002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.842359,"lon":-116.684078,"icon":""}]} |
Location: 00/10-13-056-19W5/2 | |
Location Alias: 00/10-13-56-19 W5M | |
Location Alias 2: 00/10-13-056-19 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 19 | |
Section: 13 | |
County/Municipality: Yellowhead County | |
Well Name: ACL PINE CK 10-13-56-19 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0065453 | |
License Date: 1977-08-25 | |
License Status: Abandoned | |
Spud Date: 1977-09-07 | |
Final Drill Date: 1977-10-20 | |
Well Total Depth: 2833.40 m | |
Surface Hole Latitude: 53.842359 | |
Surface Hole Longitude: -116.684078 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-08-25 | Obtained License |
1977-09-08 | Lost Circulation Occurred |
1977-10-02 | Drill Stem Test Performed |
1977-10-04 | Drill Stem Test Performed |
1977-10-20 | Finished Drilling |
1977-10-23 | Drill Stem Test Performed |
1977-10-24 | Drill Stem Test Performed |
1977-10-26 | Drill Stem Test Performed |
1977-11-01 | Production Casing Operation Performed |
1977-11-26 | Perforation Treatment Performed - Jet Perforation |
1977-12-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1977-12-16 | Perforation Treatment Performed - Fractured |
1978-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-01-14 | Perforation Treatment Performed - Jet Perforation |
1978-01-18 | Perforation Treatment Performed - Jet Perforation |
1978-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-01-21 | Perforation Treatment Performed - Fractured |
1981-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-01-29 | Well Mode changed to Drilled and Cased |
1989-09-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-09-03 | Plug Back Performed |
1989-09-03 | Well Abandoned |
1989-09-03 | Well Log Performed |
1989-09-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-11-26 | Perforation | 2199.40 | 2206.10 | 13 |
1978-01-21 | Fracture | 1993.40 | 2026.30 | 0 |
1981-01-29 | Packing Device Capped w/Cement | 2129.00 | 2137.00 | 0 |
1989-09-03 | Packing Device Capped w/Cement | 1350.00 | 1358.00 | 0 |
1977-12-01 | Acid Treatment | 2199.40 | 2206.10 | 0 |
1977-12-06 | Acid Treatment | 2199.40 | 2206.10 | 0 |
1977-12-16 | Fracture | 2199.40 | 2206.10 | 0 |
1978-01-14 | Perforation | 2020.20 | 2022.70 | 7 |
1978-01-14 | Perforation | 2024.50 | 2026.30 | 7 |
1978-01-14 | Acid Treatment | 2020.20 | 2026.30 | 0 |
1978-01-18 | Perforation | 1993.40 | 1999.50 | 7 |
1978-01-19 | Acid Treatment | 1993.40 | 2026.30 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1977-09-08 | Lost Circulation | 190.00 | 193.20 |
For data sources see[5]