X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565190405000

Well Details

Well ID: 0565190405000
Loading map...
Location: 00/05-04-056-19W5/0
Location Alias: 00/05-04-56-19 W5M
Location Alias 2: 00/05-04-056-19 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 19
Section: 04
County/Municipality: Yellowhead County
Well Name: BEC PINE CK 5-4-56-19
Operator Name: Bonavista Energy Corporation
License Number: 0423580
License Date: 2010-09-17
License Status: Amended
Spud Date: 2010-09-26
Final Drill Date: 2010-10-19
Well Total Depth: 3498.00 m
Surface Hole Latitude: 53.801477
Surface Hole Longitude: -116.762136

For data sources see[1][2]

Well History

Date Event
2010-09-17 Obtained License
2010-09-29 Surface Casing Operation Performed
2010-10-03 Direction Drilling Operation Performed - Deviate
2010-10-08 Direction Drilling Operation Performed - Horizontal
2010-10-11 Intermediate Casing Operation Performed
2010-10-19 Finished Drilling
2010-10-19 Well Mode changed to Drilled and Cased
2010-10-22 Well Log Performed
2010-10-23 Production Casing Operation Performed
2010-10-24 Rig Released
2010-11-06 Perforation Treatment Performed - Fractured
2010-11-06 Perforation Treatment Performed - Jet Perforation
2010-11-17 Well Began Production
2010-11-17 Well Fluid changed to Gas
2010-11-17 Well Mode changed to Flowing
2015-02-01 Well Fluid changed to Gas
2015-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-03 1966.60 Deviate (5 - 79 degrees)
2010-10-08 2891.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-06 Perforation 3433.50 3434.50 17
2010-11-06 Fracture 3124.80 3125.80 0
2010-11-06 Perforation 3034.90 3035.90 17
2010-11-06 Fracture 3034.90 3035.90 0
2010-11-06 Perforation 2976.90 2977.90 17
2010-11-06 Fracture 2976.90 2977.90 0
2010-11-06 Fracture 3433.50 3434.50 0
2010-11-06 Perforation 3386.10 3387.10 17
2010-11-06 Fracture 3386.10 3387.10 0
2010-11-06 Perforation 3338.70 3339.70 17
2010-11-06 Fracture 3338.70 3339.70 0
2010-11-06 Perforation 3212.90 3213.90 17
2010-11-06 Fracture 3212.90 3213.90 0
2010-11-06 Perforation 3124.80 3125.80 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 960 0.0 0.0 0.0
2011 7385 0.0 0.0 0.0
2012 8770 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8687 0.0 0.0 0.0
2015 8670 0.0 0.0 0.0
2016 8682 0.0 0.0 0.0
2017 8162 0.0 0.0 0.0
2018 8364 0.0 0.0 0.0
2019 8611 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

References