X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565190202000

Well Details

Well ID: 0565190202000
Loading map...
Location: 00/02-02-056-19W5/0
Location Alias: 00/02-02-56-19 W5M
Location Alias 2: 00/02-02-056-19 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 19
Section: 02
County/Municipality: Yellowhead County
Well Name: BEC PINE CK 2-2-56-19
Operator Name: Bonavista Energy Corporation
License Number: 0417382
License Date: 2010-01-14
License Status: Amended
Spud Date: 2010-01-26
Final Drill Date: 2010-02-19
Well Total Depth: 4075.00 m
Surface Hole Latitude: 53.819112
Surface Hole Longitude: -116.714726

For data sources see[1][2]

Well History

Date Event
2010-01-14 Obtained License
2010-01-28 Surface Casing Operation Performed
2010-02-10 Direction Drilling Operation Performed - Horizontal
2010-02-10 Well Log Performed
2010-02-13 Production Casing Operation Performed
2010-02-19 Finished Drilling
2010-02-19 Well Mode changed to Drilled and Cased
2010-02-20 Liner Casing Operation Performed
2010-02-20 Perforation Treatment Performed - Open-Hole Completion
2010-02-20 Perforation Treatment Performed - Slotted Liner or Casing
2010-02-20 Well Log Performed
2010-02-21 Rig Released
2010-03-12 Perforation Treatment Performed - Fractured
2010-03-29 Well Began Production
2010-03-29 Well Fluid changed to Gas
2010-03-29 Well Mode changed to Flowing
2015-05-01 Well Fluid changed to Gas
2015-05-01 Well Mode changed to Pumping
2019-02-01 Well Fluid changed to Gas
2019-02-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-10 2796.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-20 Slotted Liner 2786.00 4044.30 0
2010-03-12 Fracture 3070.30 3226.50 0
2010-03-12 Fracture 2891.20 3060.30 0
2010-03-12 Fracture 2786.00 2881.20 0
2010-02-20 Open Hole/Barefoot Completion 4044.30 4075.00 0
2010-03-12 Fracture 4022.10 4075.00 0
2010-03-12 Fracture 3892.60 3994.60 0
2010-03-12 Fracture 3793.10 3882.60 0
2010-03-12 Fracture 3681.20 3783.10 0
2010-03-12 Fracture 3555.20 3671.20 0
2010-03-12 Fracture 3389.90 3545.20 0
2010-03-12 Fracture 3236.50 3379.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6416 0.0 0.0 0.0
2011 8622 0.0 0.0 0.0
2012 8033 0.0 0.0 0.0
2013 8543 0.0 0.0 0.0
2014 8016 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8303 0.0 0.0 0.0
2017 7033 0.0 0.0 0.0
2018 7924 0.0 0.0 0.0
2019 8584 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References