If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0565182110000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.857419,"lon":-116.609092,"icon":""}]} |
| Location: 00/10-21-056-18W5/0 | |
| Location Alias: 00/10-21-56-18 W5M | |
| Location Alias 2: 00/10-21-056-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 21 | |
| County/Municipality: Yellowhead County | |
| Well Name: AMOCO PINE CREEK 10-21-56-18 | |
| Operator Name: Plains Midstream Canada ULC | |
| License Number: 0106097 | |
| License Date: 1984-02-21 | |
| License Status: Re-Entered | |
| Spud Date: 1984-03-18 | |
| Final Drill Date: 1984-04-11 | |
| Well Total Depth: 2762.00 m | |
| Surface Hole Latitude: 53.857419 | |
| Surface Hole Longitude: -116.609092 |
| Date | Event |
|---|---|
| 1984-02-21 | Obtained License |
| 1984-03-27 | Drill Stem Test Performed |
| 1984-04-11 | Finished Drilling |
| 1984-04-11 | Well Mode changed to Drilled and Cased |
| 1984-04-12 | Well Log Performed |
| 1984-04-13 | Drill Stem Test Performed |
| 1984-04-14 | Drill Stem Test Performed |
| 1984-04-15 | Drill Stem Test Performed |
| 1984-04-16 | Drill Stem Test Performed |
| 1984-04-18 | Well Log Performed |
| 1984-04-19 | Production Casing Operation Performed |
| 1984-09-07 | Well Log Performed |
| 1984-09-09 | Perforation Treatment Performed - Jet Perforation |
| 1984-09-09 | Well Log Performed |
| 1984-09-11 | Perforation Treatment Performed - Fractured |
| 1985-07-04 | Well Began Production |
| 1985-07-04 | Well Fluid changed to Crude Oil |
| 1985-07-04 | Well Mode changed to Flowing |
| 1991-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1991-05-26 | Plug Back Performed |
| 1991-05-26 | Well Fluid changed to Crude Oil |
| 1991-05-26 | Well Mode changed to Abandoned and Re-entered |
| 1991-05-27 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-09-09 | Perforation | 1934.00 | 1936.00 | 13 |
| 1984-09-09 | Perforation | 1936.50 | 1938.00 | 13 |
| 1984-09-11 | Fracture | 1934.00 | 1938.00 | 0 |
| 1991-05-26 | Packing Device Capped w/Cement | 1916.00 | 1925.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1985 | 984 | 0.0 | 0.0 | 0.0 |
| 1986 | 1368 | 0.0 | 0.0 | 0.0 |
| 1987 | 1152 | 0.0 | 0.0 | 0.0 |
| 1988 | 912 | 0.0 | 0.0 | 0.0 |
| 1989 | 48 | 0.0 | 0.0 | 0.0 |
| 1990 | 23 | 0.0 | 0.0 | 0.0 |
| 1991 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]