X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565160602000

Well Details

Well ID: 0565160602000
Loading map...
Location: 00/02-06-056-16W5/0
Location Alias: 00/02-06-56-16 W5M
Location Alias 2: 00/02-06-056-16 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 16
Section: 06
County/Municipality: Yellowhead County
Well Name: ISH GROAT 2-6-56-16
Operator Name: Ish Energy Ltd.
License Number: 0485922
License Date: 2017-10-19
License Status: Issued
Spud Date: 2017-11-12
Final Drill Date: 2017-11-23
Well Total Depth: 5065.00 m
Surface Hole Latitude: 53.832768
Surface Hole Longitude: -116.366485

For data sources see[1][2]

Well History

Date Event
2017-10-19 Obtained License
2017-11-13 Surface Casing Operation Performed
2017-11-15 Direction Drilling Operation Performed - Deviate
2017-11-16 Direction Drilling Operation Performed - Horizontal
2017-11-17 Intermediate Casing Operation Performed
2017-11-23 Finished Drilling
2017-11-23 Well Log Performed
2017-11-23 Well Mode changed to Drilled and Cased
2017-11-25 Liner Casing Operation Performed
2017-11-26 Perforation Treatment Performed - Open-Hole Completion
2017-11-26 Rig Released
2017-11-30 Well Log Performed
2017-12-03 Well Fluid changed to Gas
2017-12-03 Well Mode changed to Testing
2017-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-12 Well Began Production
2017-12-12 Well Fluid changed to Gas
2017-12-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-12 Savanna Drilling Corp. 638 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-15 1771.70 Deviate (5 - 79 degrees)
2017-11-16 2108.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-11-26 Open Hole/Barefoot Completion 5060.00 5065.00 0
2017-12-07 Multi-Stage Fracture 4148.50 4148.60 0
2017-12-07 Multi-Stage Fracture 4053.30 4053.40 0
2017-12-07 Multi-Stage Fracture 3958.20 3958.30 0
2017-12-07 Multi-Stage Fracture 3863.10 3863.20 0
2017-12-07 Multi-Stage Fracture 3767.90 3768.00 0
2017-12-07 Multi-Stage Fracture 3672.80 3672.90 0
2017-12-07 Multi-Stage Fracture 3564.40 3564.50 0
2017-12-08 Multi-Stage Fracture 3469.20 3469.30 0
2017-12-08 Multi-Stage Fracture 3374.10 3374.20 0
2017-12-08 Multi-Stage Fracture 3279.00 3279.10 0
2017-12-07 Multi-Stage Fracture 5023.90 5024.00 0
2017-12-08 Multi-Stage Fracture 3183.90 3184.00 0
2017-12-08 Multi-Stage Fracture 3088.70 3088.80 0
2017-12-08 Multi-Stage Fracture 2993.70 2993.80 0
2017-12-08 Multi-Stage Fracture 2898.30 2898.40 0
2017-12-08 Multi-Stage Fracture 2803.20 2803.30 0
2017-12-08 Multi-Stage Fracture 2708.00 2708.10 0
2017-12-08 Multi-Stage Fracture 2612.80 2612.90 0
2017-12-08 Multi-Stage Fracture 2517.60 2517.70 0
2017-12-08 Multi-Stage Fracture 2409.20 2409.30 0
2017-12-08 Multi-Stage Fracture 2314.00 2314.10 0
2017-12-07 Multi-Stage Fracture 4936.10 4936.20 0
2017-12-08 Multi-Stage Fracture 2218.90 2219.00 0
2017-12-07 Multi-Stage Fracture 4840.80 4840.90 0
2017-12-07 Multi-Stage Fracture 4745.40 4745.50 0
2017-12-07 Multi-Stage Fracture 4528.10 4528.20 0
2017-12-07 Multi-Stage Fracture 4433.20 4433.30 0
2017-12-07 Multi-Stage Fracture 4337.90 4338.00 0
2017-12-07 Multi-Stage Fracture 4243.20 4243.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-07 2017-12-08 2,032 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water 7732-18-5 100 77.0319 N/A
SAND-PREMIUM WHITE-30/50. BULK Halliburton Crystalline silica. quartz 14808-60-7 100 18.828 N/A
MC B-8642 MultiChem Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.0108 N/A
Inert Ingredient(s) Not Available 100 0.0108 N/A
Quaternary ammonium compounds.benzyl-C12-16-alkyldimethyl.chloride
s
68424-85-1 100 0.0108 N/A
Cla-Web(TM) Halliburton Clay Control Hydroxyalkyl alkylammonium chloride 8933 100 0.061 N/A
Inert ingredient(s) Not Available 100 0.061 N/A
Proprietary ingredient(s) Trade Secret 100 0.0617 N/A
Quaternary amine 11619 100 0.061 N/A
Nitrogen Halliburton Energizing Fluid Nitrogen 7727-37-9 100 3.952 N/A
Excelerate PS-2 Halliburton Friction Reducer Hydro treated light petroleum distilate 64742-47-8 100 0.063 N/A
Inert Ingredient(s) Not Available 100 0.063 N/A
Inorganic Salt 11607 100 0.063 N/A
MC S-2730 MultiChem Scale Inhibitor Inert Ingredient(s) Not Available 100 0.0098 N/A
Methanol 67-56-1 100 0.0098 N/A
Sodium chloride 7647-14-5 100 0.0098 N/A
OptiKleen-WF(TM) Halliburton Solvent Sodium perborate tetrahydrate 10486-00-7 100 0.0081 N/A
OILPERM A Halliburton Surfactant Ethanol 64-17-5 100 0.035 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.035 N/A
Inert Ingredient(s) Not Available 100 0.035 N/A
Naphthalene 91-20-3 100 0.035 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.
branched
127087-87-0 100 0.035 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-11-30 2017-12-05 Surface Water - Runoff 4830
2017-12-05 2017-12-08 Municipal Water 589

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 384 0.0 0.0 0.0
2018 8233 0.0 0.0 0.0
2019 8685 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-23 No Incident Encountered 0.00 0.00
2017-12-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References