X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565140202000

Well Details

Well ID: 0565140202000
Loading map...
Location: 00/02-02-056-14W5/0
Location Alias: 00/02-02-56-14 W5M
Location Alias 2: 00/02-02-056-14 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 14
Section: 02
County/Municipality: Yellowhead County
Well Name: CLEARVIEW MCLEOD 2-2-56-14
Operator Name: Clearview Resources Ltd.
License Number: 0447841
License Date: 2012-08-20
License Status: Amended
Spud Date: 2012-09-06
Final Drill Date: 2012-09-20
Well Total Depth: 3009.00 m
Surface Hole Latitude: 53.818273
Surface Hole Longitude: -115.972076

For data sources see[1][2]

Well History

Date Event
2012-08-20 Obtained License
2012-09-07 Surface Casing Operation Performed
2012-09-09 Direction Drilling Operation Performed - Deviate
2012-09-11 Direction Drilling Operation Performed - Horizontal
2012-09-14 Intermediate Casing Operation Performed
2012-09-14 Well Log Performed
2012-09-20 Finished Drilling
2012-09-20 Well Mode changed to Drilled and Cased
2012-09-23 Perforation Treatment Performed - Open-Hole Completion
2012-09-24 Liner Casing Operation Performed
2012-09-25 Rig Released
2012-10-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-10 Well Began Production
2012-10-10 Well Fluid changed to Crude Oil
2012-10-10 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-06 Excalibur Drilling Ltd. SIX N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-09 1163.70 Deviate (5 - 79 degrees)
2012-09-11 1585.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-23 Open Hole/Barefoot Completion 3006.00 3009.00 0
2012-10-09 Multi-Stage Fracture 2442.60 2442.70 0
2012-10-09 Multi-Stage Fracture 2380.60 2380.70 0
2012-10-09 Multi-Stage Fracture 2305.70 2305.80 0
2012-10-09 Multi-Stage Fracture 2246.30 2246.40 0
2012-10-09 Multi-Stage Fracture 2171.10 2171.20 0
2012-10-09 Multi-Stage Fracture 2111.50 2111.60 0
2012-10-09 Multi-Stage Fracture 2036.40 2036.50 0
2012-10-09 Multi-Stage Fracture 1974.40 1974.50 0
2012-10-09 Multi-Stage Fracture 1913.00 1913.10 0
2012-10-09 Multi-Stage Fracture 1836.90 1837.00 0
2012-10-09 Multi-Stage Fracture 2982.50 2982.60 0
2012-10-09 Multi-Stage Fracture 1778.30 1778.40 0
2012-10-09 Multi-Stage Fracture 1717.20 1717.30 0
2012-10-09 Multi-Stage Fracture 2914.50 2914.60 0
2012-10-09 Multi-Stage Fracture 2839.10 2839.20 0
2012-10-09 Multi-Stage Fracture 2777.60 2777.70 0
2012-10-09 Multi-Stage Fracture 2716.20 2716.30 0
2012-10-09 Multi-Stage Fracture 2640.50 2640.60 0
2012-10-09 Multi-Stage Fracture 2580.00 2580.10 0
2012-10-09 Multi-Stage Fracture 2505.20 2505.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1730 0.0 0.0 0.0
2013 8563 0.0 0.0 0.0
2014 8651 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 7935 0.0 0.0 0.0
2017 8483 0.0 0.0 0.0
2018 8723 0.0 0.0 0.0
2019 7864 0.0 0.0 0.0
2020 1918 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-25 No Incident Encountered 0.00 0.00
2012-10-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References