If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565140202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.818273,"lon":-115.972076,"icon":""}]} |
Location: 00/02-02-056-14W5/0 | |
Location Alias: 00/02-02-56-14 W5M | |
Location Alias 2: 00/02-02-056-14 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 14 | |
Section: 02 | |
County/Municipality: Yellowhead County | |
Well Name: CLEARVIEW MCLEOD 2-2-56-14 | |
Operator Name: Clearview Resources Ltd. | |
License Number: 0447841 | |
License Date: 2012-08-20 | |
License Status: Amended | |
Spud Date: 2012-09-06 | |
Final Drill Date: 2012-09-20 | |
Well Total Depth: 3009.00 m | |
Surface Hole Latitude: 53.818273 | |
Surface Hole Longitude: -115.972076 |
Date | Event |
---|---|
2012-08-20 | Obtained License |
2012-09-07 | Surface Casing Operation Performed |
2012-09-09 | Direction Drilling Operation Performed - Deviate |
2012-09-11 | Direction Drilling Operation Performed - Horizontal |
2012-09-14 | Intermediate Casing Operation Performed |
2012-09-14 | Well Log Performed |
2012-09-20 | Finished Drilling |
2012-09-20 | Well Mode changed to Drilled and Cased |
2012-09-23 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-24 | Liner Casing Operation Performed |
2012-09-25 | Rig Released |
2012-10-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-10 | Well Began Production |
2012-10-10 | Well Fluid changed to Crude Oil |
2012-10-10 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-06 | Excalibur Drilling Ltd. | SIX | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-09 | 1163.70 | Deviate (5 - 79 degrees) |
2012-09-11 | 1585.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-23 | Open Hole/Barefoot Completion | 3006.00 | 3009.00 | 0 |
2012-10-09 | Multi-Stage Fracture | 2442.60 | 2442.70 | 0 |
2012-10-09 | Multi-Stage Fracture | 2380.60 | 2380.70 | 0 |
2012-10-09 | Multi-Stage Fracture | 2305.70 | 2305.80 | 0 |
2012-10-09 | Multi-Stage Fracture | 2246.30 | 2246.40 | 0 |
2012-10-09 | Multi-Stage Fracture | 2171.10 | 2171.20 | 0 |
2012-10-09 | Multi-Stage Fracture | 2111.50 | 2111.60 | 0 |
2012-10-09 | Multi-Stage Fracture | 2036.40 | 2036.50 | 0 |
2012-10-09 | Multi-Stage Fracture | 1974.40 | 1974.50 | 0 |
2012-10-09 | Multi-Stage Fracture | 1913.00 | 1913.10 | 0 |
2012-10-09 | Multi-Stage Fracture | 1836.90 | 1837.00 | 0 |
2012-10-09 | Multi-Stage Fracture | 2982.50 | 2982.60 | 0 |
2012-10-09 | Multi-Stage Fracture | 1778.30 | 1778.40 | 0 |
2012-10-09 | Multi-Stage Fracture | 1717.20 | 1717.30 | 0 |
2012-10-09 | Multi-Stage Fracture | 2914.50 | 2914.60 | 0 |
2012-10-09 | Multi-Stage Fracture | 2839.10 | 2839.20 | 0 |
2012-10-09 | Multi-Stage Fracture | 2777.60 | 2777.70 | 0 |
2012-10-09 | Multi-Stage Fracture | 2716.20 | 2716.30 | 0 |
2012-10-09 | Multi-Stage Fracture | 2640.50 | 2640.60 | 0 |
2012-10-09 | Multi-Stage Fracture | 2580.00 | 2580.10 | 0 |
2012-10-09 | Multi-Stage Fracture | 2505.20 | 2505.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1730 | 0.0 | 0.0 | 0.0 |
2013 | 8563 | 0.0 | 0.0 | 0.0 |
2014 | 8651 | 0.0 | 0.0 | 0.0 |
2015 | 8739 | 0.0 | 0.0 | 0.0 |
2016 | 7935 | 0.0 | 0.0 | 0.0 |
2017 | 8483 | 0.0 | 0.0 | 0.0 |
2018 | 8723 | 0.0 | 0.0 | 0.0 |
2019 | 7864 | 0.0 | 0.0 | 0.0 |
2020 | 1918 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-25 | No Incident Encountered | 0.00 | 0.00 |
2012-10-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]