X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565093610000

Well Details

Well ID: 0565093610000
Loading map...
Location: 00/10-36-056-09W5/0
Location Alias: 00/10-36-56-09 W5M
Location Alias 2: 00/10-36-056-09 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 09
Section: 36
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 10-36-56-9
Operator Name: Point Loma Resources Ltd.
License Number: 0030809
License Date: 1966-08-10
License Status: Abandoned
Spud Date: 1966-08-24
Final Drill Date: 1966-08-29
Well Total Depth: 1572.50 m
Surface Hole Latitude: 53.884214
Surface Hole Longitude: -115.201135

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-10 Obtained License
1966-08-29 Finished Drilling
1966-08-29 Production Casing Operation Performed
1966-08-29 Well Mode changed to Drilled and Cased
1966-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-07 Perforation Treatment Performed - Jet Perforation
1966-10-01 Well Began Production
1966-10-01 Well Fluid changed to Crude Oil
1966-10-01 Well Mode changed to Flowing
1967-04-05 Well Fluid changed to Crude Oil
1967-04-05 Well Mode changed to Pumping
1971-01-12 Well Fluid changed to Crude Oil
1971-01-12 Well Mode changed to Suspended
1972-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-11-10 Well Fluid changed to Crude Oil
1972-11-10 Well Mode changed to Abandoned Zone
1976-05-19 Perforation Treatment Performed - Jet Perforation
1976-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-30 Perforation Treatment Performed - Jet Perforation
1978-09-06 Perforation Treatment Performed - Cement Squeeze
1978-09-07 Perforation Treatment Performed - Jet Perforation
1978-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-12 Perforation Treatment Performed - Jet Perforation
1978-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-19 Perforation Treatment Performed - Chemical Squeeze
2007-12-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-01 Perforation Treatment Performed - Cement Plug
2007-12-01 Plug Back Performed
2013-10-23 Well Log Performed
2013-10-24 Perforation Treatment Performed - Jet Perforation
2013-10-24 Perforation Treatment Performed - Remedial Casing
2013-10-24 Well Log Performed
2013-10-25 Perforation Treatment Performed - Jet Perforation
2013-10-25 Well Log Performed
2013-10-26 Perforation Treatment Performed - Remedial Casing
2013-10-27 Perforation Treatment Performed - Jet Perforation
2013-10-27 Well Log Performed
2013-10-28 Perforation Treatment Performed - Remedial Casing
2013-10-29 Perforation Treatment Performed - Jet Perforation
2013-10-29 Well Log Performed
2013-10-30 Perforation Treatment Performed - Remedial Casing
2013-10-31 Perforation Treatment Performed - Jet Perforation
2013-10-31 Well Log Performed
2013-11-01 Perforation Treatment Performed - Remedial Casing
2015-11-27 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-07 Perforation 1563.00 1564.20 13
1978-09-11 Packing Device Capped w/Cement 1555.00 1556.30 0
1978-09-12 Perforation 1548.10 1548.70 7
1978-09-12 Perforation 1550.20 1551.40 7
1978-09-20 Packing Device Capped w/Cement 1541.30 1543.80 0
1990-06-19 Chemical Squeeze 1532.50 1539.80 0
2007-12-01 Cement Plug 1538.60 1546.60 0
2007-12-01 Packing Device Capped w/Cement 1516.00 1524.00 0
2013-10-24 Perforation 892.50 893.50 17
2013-10-24 Perforation 807.00 808.00 17
2013-10-24 Remedial Casing Cementing 892.50 893.50 0
1966-09-07 Acid Treatment 1563.00 1564.20 0
2013-10-24 Remedial Casing Cementing 807.00 808.00 0
2013-10-25 Perforation 600.00 601.00 17
2013-10-25 Perforation 550.00 551.00 17
2013-10-25 Perforation 470.00 471.00 17
2013-10-26 Remedial Casing Cementing 600.00 601.00 0
2013-10-26 Remedial Casing Cementing 550.00 551.00 0
2013-10-27 Perforation 363.00 364.00 17
2013-10-28 Remedial Casing Cementing 470.00 471.00 0
2013-10-28 Remedial Casing Cementing 363.00 364.00 0
2013-10-29 Perforation 290.00 291.00 17
1972-11-10 Packing Device Capped w/Cement 1557.50 1557.50 0
2013-10-29 Perforation 237.00 238.00 17
2013-10-30 Remedial Casing Cementing 290.00 291.00 0
2013-10-30 Remedial Casing Cementing 237.00 238.00 0
2013-10-31 Perforation 162.00 163.00 17
2013-11-01 Remedial Casing Cementing 162.00 163.00 0
1976-05-19 Perforation 1532.50 1539.80 7
1976-05-20 Acid Treatment 1532.50 1539.80 0
1978-08-30 Perforation 1563.00 1564.20 13
1978-09-06 Cement Squeeze 1563.00 1564.20 0
1978-09-07 Perforation 1556.90 1558.10 7
1978-09-07 Perforation 1559.40 1560.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 3449 0.0 0.0 0.0
1968 5870 0.0 0.0 0.0
1969 7614 0.0 0.0 0.0
1970 7822 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References