X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565083110000

Well Details

Well ID: 0565083110000
Loading map...
Location: 00/10-31-056-08W5/0
Location Alias: 00/10-31-56-08 W5M
Location Alias 2: 00/10-31-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 31
County/Municipality: Lac Ste. Anne County
Well Name: PDS PADDLER 10-31-56-8
Operator Name: Wolverine Energy And Infrastructure Inc.
License Number: 0077046
License Date: 1979-07-23
License Status: Abandoned
Spud Date: 1979-07-24
Final Drill Date: 1979-08-05
Well Total Depth: 1555.00 m
Surface Hole Latitude: 53.882881
Surface Hole Longitude: -115.173349

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-07-23 Obtained License
1979-08-05 Finished Drilling
1979-08-09 Drill Stem Test Performed
1979-08-10 Drill Stem Test Performed
1979-08-13 Production Casing Operation Performed
1979-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-23 Perforation Treatment Performed - Jet Perforation
1979-08-25 Well Mode changed to Drilled and Cased
1979-11-01 Well Began Production
1979-11-01 Well Fluid changed to Gas
1979-11-01 Well Mode changed to Flowing
1990-10-02 Perforation Treatment Performed - Chemical Squeeze
1998-09-01 Well Fluid changed to Gas
1998-09-01 Well Mode changed to Suspended
2017-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-09-19 Plug Back Performed
2017-09-19 Well Fluid changed to Gas
2017-09-19 Well Mode changed to Abandoned Zone
2017-09-20 Well Abandoned
2017-09-20 Well Fluid changed to Gas
2017-09-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-23 Perforation 1517.00 1520.00 6
1979-08-23 Acid Treatment 1517.00 1520.00 0
1990-10-02 Chemical Squeeze 1517.00 1520.00 0
2017-09-19 Packing Device Capped w/Cement 1497.00 1505.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 770 0.0 0.0 0.0
1980 8098 0.0 0.0 0.0
1981 8472 0.0 0.0 0.0
1982 6483 0.0 0.0 0.0
1983 7280 0.0 0.0 0.0
1984 7883 0.0 0.0 0.0
1985 7832 0.0 0.0 0.0
1986 6672 0.0 0.0 0.0
1987 6850 0.0 0.0 0.0
1988 7862 0.0 0.0 0.0
1989 4363 0.0 0.0 0.0
1990 4813 0.0 0.0 0.0
1991 2617 0.0 0.0 0.0
1992 5021 0.0 0.0 0.0
1993 7801 0.0 0.0 0.0
1994 8618 0.0 0.0 0.0
1995 5038 0.0 0.0 0.0
1996 3347 0.0 0.0 0.0
1997 6590 0.0 0.0 0.0
1998 3851 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References