0565083005000

Well Details

Well ID: 0565083005000
Loading map...
Location: 00/05-30-056-08W5/0
Location Alias: 00/05-30-56-08 W5M
Location Alias 2: 00/05-30-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 30
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 5-30-56-8
Operator Name: Point Loma Resources Ltd.
License Number: 0013323
License Date: 1957-05-07
License Status: Abandoned
Spud Date: 1957-05-13
Final Drill Date: 1957-06-07
Well Total Depth: 1621.50 m
Surface Hole Latitude: 53.866618
Surface Hole Longitude: -115.189458

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-05-07 Obtained License
1957-05-24 Drill Stem Test Performed
1957-06-02 Drill Stem Test Performed
1957-06-07 Finished Drilling
1957-06-09 Production Casing Operation Performed
1957-06-10 Well Mode changed to Drilled and Cased
1958-10-06 Perforation Treatment Performed - Jet Perforation
1958-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-10-16 Well Began Production
1958-10-16 Well Fluid changed to Crude Oil
1958-10-16 Well Mode changed to Flowing
1959-04-29 Well Fluid changed to Crude Oil
1959-04-29 Well Mode changed to Suspended
1959-09-17 Well Fluid changed to Crude Oil
1959-09-17 Well Mode changed to Flowing
1959-10-05 Well Fluid changed to Crude Oil
1959-10-05 Well Mode changed to Suspended
1960-06-24 Well Fluid changed to Crude Oil
1960-06-24 Well Mode changed to Flowing
1966-12-03 Well Fluid changed to Crude Oil
1966-12-03 Well Mode changed to Pumping
1968-10-04 Perforation Treatment Performed - Cement Squeeze
1968-10-05 Perforation Treatment Performed - Cement Squeeze
1968-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-06 Perforation Treatment Performed - Jet Perforation
1971-01-12 Well Fluid changed to Crude Oil
1971-01-12 Well Mode changed to Suspended
1972-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-11-10 Well Fluid changed to Crude Oil
1972-11-10 Well Mode changed to Abandoned Zone
1977-07-25 Perforation Treatment Performed - Jet Perforation
1977-07-26 Perforation Treatment Performed - Cement Squeeze
1977-07-30 Perforation Treatment Performed - Cement Squeeze
1977-08-02 Perforation Treatment Performed - Cement Squeeze
1977-08-08 Perforation Treatment Performed - Cement Squeeze
1977-08-08 Perforation Treatment Performed - Jet Perforation
1979-06-12 Perforation Treatment Performed - Jet Perforation
1979-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-08 Perforation Treatment Performed - Jet Perforation
1990-12-08 Plug Back Performed
1990-12-08 Well Log Performed
1990-12-09 Perforation Treatment Performed - Remedial Casing
1991-05-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-06 Perforation 1560.30 1561.80 13
1977-07-30 Cement Squeeze 1542.00 1542.30 0
1977-08-02 Cement Squeeze 1542.00 1542.30 0
1977-08-08 Perforation 1541.70 1542.00 10
1977-08-08 Cement Squeeze 1541.70 1542.00 0
1979-06-12 Perforation 1525.20 1525.80 7
1979-06-12 Perforation 1527.00 1527.70 7
1979-06-12 Perforation 1528.30 1528.90 7
1979-06-15 Acid Treatment 1525.20 1528.90 0
1990-12-08 Packing Device Capped w/Cement 1512.00 1520.00 0
1990-12-08 Perforation 272.00 273.00 13
1958-10-07 Acid Treatment 1560.30 1561.80 0
1990-12-09 Remedial Casing Cementing 272.00 273.00 0
1968-10-04 Cement Squeeze 1560.30 1561.80 0
1968-10-05 Cement Squeeze 1560.30 1561.80 0
1968-10-06 Perforation 1555.10 1557.50 13
1968-10-06 Acid Treatment 1555.10 1557.50 0
1972-11-10 Packing Device Capped w/Cement 1549.90 1549.90 0
1977-07-25 Perforation 1542.00 1542.30 10
1977-07-26 Cement Squeeze 1542.00 1542.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4614 0.0 0.0 0.0
1968 3823 0.0 0.0 0.0
1969 5039 0.0 0.0 0.0
1970 6597 0.0 0.0 0.0

For data sources see[5]