X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565082007000

Well Details

Well ID: 0565082007000
Loading map...
Location: 00/07-20-056-08W5/0
Location Alias: 00/07-20-56-08 W5M
Location Alias 2: 00/07-20-056-08 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 08
Section: 20
County/Municipality: Lac Ste. Anne County
Well Name: FMEL PADDLER 7-20-56-8
Operator Name: Point Loma Resources Ltd.
License Number: 0012579
License Date: 1956-11-01
License Status: Abandoned
Spud Date: 1956-11-07
Final Drill Date: 1957-12-14
Well Total Depth: 1630.70 m
Surface Hole Latitude: 53.851503
Surface Hole Longitude: -115.152344

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-11-01 Obtained License
1956-11-13 Drill Stem Test Performed
1956-11-19 Drill Stem Test Performed
1956-11-20 Drill Stem Test Performed
1956-11-26 Drill Stem Test Performed
1956-11-29 Drill Stem Test Performed
1956-11-30 Drill Stem Test Performed
1956-12-05 Drill Stem Test Performed
1956-12-07 Drill Stem Test Performed
1956-12-11 Drill Stem Test Performed
1956-12-18 Drill Stem Test Performed
1956-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-19 Perforation Treatment Performed - Jet Perforation
1956-12-23 Perforation Treatment Performed - Jet Perforation
1956-12-27 Perforation Treatment Performed - Jet Perforation
1956-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-01 Perforation Treatment Performed - Cement Squeeze
1957-01-03 Perforation Treatment Performed - Acid Wash - No Pressure
1957-01-03 Perforation Treatment Performed - Jet Perforation
1957-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-07 Perforation Treatment Performed - Acid Wash - No Pressure
1957-01-07 Perforation Treatment Performed - Cement Squeeze
1957-01-07 Perforation Treatment Performed - Jet Perforation
1957-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-09 Perforation Treatment Performed - Cement Squeeze
1957-01-10 Drill Stem Test Performed
1957-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-01-11 Perforation Treatment Performed - Jet Perforation
1957-01-16 Perforation Treatment Performed - Cement Squeeze
1957-11-18 Well Mode changed to Drilled and Cased
1957-12-14 Finished Drilling
1957-12-15 Production Casing Operation Performed
1958-05-11 Perforation Treatment Performed - Jet Perforation
1958-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-10 Well Mode changed to Drilled and Cased
1976-10-26 Well Began Production
1976-10-26 Well Fluid changed to Gas
1976-10-26 Well Mode changed to Flowing
1980-08-14 Perforation Treatment Performed - Jet Perforation
1980-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-12-11 Perforation Treatment Performed - Chemical Squeeze
1990-01-06 Perforation Treatment Performed - Chemical Squeeze
2017-12-03 Well Log Performed
2018-12-31 Well Fluid changed to Gas
2018-12-31 Well Mode changed to Suspended
2019-01-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-12-19 Perforation 1601.70 1604.80 13
1957-01-05 Acid Treatment 1577.30 1580.40 0
1957-01-07 Cement Squeeze 1577.30 1580.40 0
1957-01-07 Perforation 1572.80 1576.70 0
1957-01-07 Acid Wash 1572.80 1576.70 0
1957-01-07 Perforation 1574.00 1577.90 13
1957-01-07 Acid Wash 1574.00 1577.90 0
1957-01-08 Acid Treatment 1574.00 1577.90 0
1957-01-09 Cement Squeeze 1577.30 1580.40 0
1957-01-11 Perforation 1556.00 1557.50 13
1957-01-11 Acid Treatment 1556.00 1557.50 0
1956-12-19 Acid Treatment 1601.70 1604.80 0
1957-01-16 Cement Squeeze 1556.00 1557.50 0
1958-05-11 Perforation 1528.90 1530.70 13
1958-05-11 Perforation 1532.50 1539.20 13
1958-05-12 Acid Treatment 1528.90 1539.20 0
1980-08-14 Perforation 1528.90 1530.70 9
1980-08-14 Perforation 1532.50 1539.20 9
1980-08-15 Acid Treatment 1528.90 1539.20 0
1989-12-11 Chemical Squeeze 1528.90 1539.20 0
1990-01-06 Chemical Squeeze 1528.90 1539.20 0
1956-12-23 Perforation 1597.20 1601.70 0
1956-12-27 Perforation 1601.70 1604.80 13
1956-12-29 Acid Treatment 1601.70 1604.80 0
1956-12-31 Acid Treatment 1601.70 1604.80 0
1957-01-01 Cement Squeeze 1597.20 1604.80 0
1957-01-03 Perforation 1577.30 1580.40 13
1957-01-03 Acid Wash 1577.30 1580.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1524 0.0 0.0 0.0
1977 4483 0.0 0.0 0.0
1978 4935 0.0 0.0 0.0
1979 6858 0.0 0.0 0.0
1980 3867 0.0 0.0 0.0
1982 2875 0.0 0.0 0.0
1983 8350 0.0 0.0 0.0
1984 6351 0.0 0.0 0.0
1985 7783 0.0 0.0 0.0
1986 8120 0.0 0.0 0.0
1987 6646 0.0 0.0 0.0
1988 4498 0.0 0.0 0.0
1989 2596 0.0 0.0 0.0
1990 5216 0.0 0.0 0.0
1991 8333 0.0 0.0 0.0
1992 4342 0.0 0.0 0.0
1993 7805 0.0 0.0 0.0
1994 3066 0.0 0.0 0.0
1995 5655 0.0 0.0 0.0
1996 4565 0.0 0.0 0.0
1997 5096 0.0 0.0 0.0
1998 2712 0.0 0.0 0.0
1999 7030 0.0 0.0 0.0
2000 7272 0.0 0.0 0.0
2001 7951 0.0 0.0 0.0
2002 8348 0.0 0.0 0.0
2003 7329 0.0 0.0 0.0
2004 5524 0.0 0.0 0.0
2005 8439 0.0 0.0 0.0
2006 4608 0.0 0.0 0.0
2017 1 0.0 0.0 0.0

For data sources see[5]

References