If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0565052506030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.865539,"lon":-114.601484,"icon":""}]} |
Location: 03/06-25-056-05W5/0 | |
Location Alias: 03/06-25-56-05 W5M | |
Location Alias 2: 03/06-25-056-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 056 | |
Meridian: 5 | |
Range: 05 | |
Section: 25 | |
County/Municipality: Lac Ste. Anne County | |
Well Name: JOURNEY CHERHILL 6-25-56-5 | |
Operator Name: Journey Energy Inc. | |
License Number: 0385682 | |
License Date: 2007-11-27 | |
License Status: Amended | |
Spud Date: 2008-02-25 | |
Final Drill Date: 2008-03-05 | |
Well Total Depth: 2024.00 m | |
Surface Hole Latitude: 53.865539 | |
Surface Hole Longitude: -114.601484 |
Date | Event |
---|---|
2007-11-27 | Obtained License |
2008-02-27 | Surface Casing Operation Performed |
2008-02-29 | Direction Drilling Operation Performed - Horizontal |
2008-03-02 | Production Casing Operation Performed |
2008-03-05 | Finished Drilling |
2008-03-05 | Well Structure changed to Drain |
2008-03-10 | Perforation Treatment Performed - Open-Hole Completion |
2008-03-10 | Rig Released |
2008-03-16 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-02-29 | 1039.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-03-10 | Open Hole/Barefoot Completion | 1396.00 | 2024.00 | 0 |
For data sources see[5]