X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565052403000

Well Details

Well ID: 0565052403000
Loading map...
Location: 00/03-24-056-05W5/0
Location Alias: 00/03-24-56-05 W5M
Location Alias 2: 00/03-24-056-05 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 05
Section: 24
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 3-24-56-5
Operator Name: Journey Energy Inc.
License Number: 0169035
License Date: 1994-07-27
License Status: Amended
Spud Date: 1994-08-15
Final Drill Date: 1994-08-21
Well Total Depth: 1278.00 m
Surface Hole Latitude: 53.849140
Surface Hole Longitude: -114.611161

For data sources see[1][2]

Well History

Date Event
1994-07-27 Obtained License
1994-08-16 Surface Casing Operation Performed
1994-08-20 Well Log Performed
1994-08-21 Finished Drilling
1994-08-21 Kick Occurred
1994-08-21 Well Mode changed to Drilled and Cased
1994-08-22 Production Casing Operation Performed
1994-08-23 Rig Released
1994-10-25 Well Log Performed
1994-10-26 Perforation Treatment Performed - Jet Perforation
1994-11-02 Well Began Production
1994-11-02 Well Fluid changed to Gas
1994-11-02 Well Mode changed to Flowing
1996-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-10 Well Fluid changed to Gas
1997-10-10 Well Mode changed to Suspended
2000-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-28 Plug Back Performed
2000-10-28 Well Fluid changed to Gas
2000-10-28 Well Log Performed
2000-10-28 Well Mode changed to Abandoned Zone
2000-10-29 Perforation Treatment Performed - Jet Perforation
2000-10-29 Well Log Performed
2003-07-21 Perforation Treatment Performed - Cement Squeeze
2003-07-21 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-26 Perforation 1274.50 1276.50 14
1996-11-08 Acid Treatment 1274.50 1276.50 0
1997-03-18 Acid Treatment 1274.50 1276.50 0
2000-10-28 Packing Device Capped w/Cement 1262.00 1270.00 0
2000-10-29 Perforation 1110.00 1111.00 15
2003-07-21 Cement Squeeze 1110.00 1111.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1260 0.0 0.0 0.0
1995 8389 0.0 0.0 0.0
1996 6866 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-08-21 Kick 1277.00 1277.00

For data sources see[6]

References