X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0565041908000

Well Details

Well ID: 0565041908000
Loading map...
Location: 00/08-19-056-04W5/0
Location Alias: 00/08-19-56-04 W5M
Location Alias 2: 00/08-19-056-04 W5/00
Country: Canada
Province: Alberta
Township: 056
Meridian: 5
Range: 04
Section: 19
County/Municipality: Lac Ste. Anne County
Well Name: JOURNEY CHERHILL 8-19-56-4
Operator Name: Journey Energy Inc.
License Number: 0098502
License Date: 1982-11-04
License Status: Suspension
Spud Date: 1983-01-05
Final Drill Date: 1983-01-11
Well Total Depth: 1365.00 m
Surface Hole Latitude: 53.851921
Surface Hole Longitude: -114.572807

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-04 Obtained License
1983-01-11 Finished Drilling
1983-01-11 Well Mode changed to Drilled and Cased
1983-01-12 Well Log Performed
1983-01-14 Production Casing Operation Performed
1983-02-13 Perforation Treatment Performed - Jet Perforation
1983-06-02 Well Began Production
1983-06-02 Well Fluid changed to Crude Oil
1983-06-02 Well Mode changed to Flowing
1992-05-20 Well Fluid changed to Crude Oil
1992-05-20 Well Mode changed to Pumping
1995-03-17 Perforation Treatment Performed - Jet Perforation
1995-03-17 Well Log Performed
1998-07-22 Well Fluid changed to Crude Oil
1998-07-22 Well Log Performed
1998-07-22 Well Mode changed to Suspended
1998-07-23 Perforation Treatment Performed - Jet Perforation
1998-07-23 Well Fluid changed to Crude Oil
1998-07-23 Well Log Performed
1998-07-23 Well Mode changed to Suspended
2001-02-27 Perforation Treatment Performed - Jet Perforation
2001-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-10 Perforation Treatment Performed - Cement Plug
2001-11-10 Plug Back Performed
2001-11-10 Well Fluid changed to Crude Oil
2001-11-10 Well Mode changed to Abandoned Zone
2001-11-11 Perforation Treatment Performed - Jet Perforation
2001-11-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-12 Perforation Treatment Performed - Jet Perforation
2001-11-12 Plug Back Performed
2011-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-13 Perforation 1329.00 1331.00 7
2011-10-06 Packing Device Capped w/Cement 377.00 385.00 0
1995-03-17 Perforation 1323.00 1326.00 13
1998-07-23 Perforation 1282.50 1284.50 13
2001-02-27 Perforation 1282.50 1284.50 13
2001-11-10 Cement Plug 1310.00 1318.00 0
2001-11-10 Packing Device Capped w/Cement 1272.00 1280.00 0
2001-11-11 Perforation 521.00 523.00 13
2001-11-12 Packing Device Capped w/Cement 509.00 517.00 0
2001-11-12 Perforation 388.50 390.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2335 0.0 0.0 0.0
1984 2397 0.0 0.0 0.0
1985 3505 0.0 0.0 0.0
1986 3582 0.0 0.0 0.0
1987 3373 0.0 0.0 0.0
1988 2816 0.0 0.0 0.0
1989 646 0.0 0.0 0.0
1990 1278 0.0 0.0 0.0
1991 2544 0.0 0.0 0.0
1992 3077 0.0 0.0 0.0
1993 4436 0.0 0.0 0.0
1994 7887 0.0 0.0 0.0
1995 8377 0.0 0.0 0.0
1996 7391 0.0 0.0 0.0
1997 8476 0.0 0.0 0.0
1998 4344 0.0 0.0 0.0

For data sources see[5]

References