If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0564250503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.80713,"lon":-113.685373,"icon":""}]} |
| Location: 00/03-05-056-25W4/0 | |
| Location Alias: 00/03-05-56-25 W4M | |
| Location Alias 2: 00/03-05-056-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 056 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 05 | |
| County/Municipality: Sturgeon County | |
| Well Name: DEVNIC ET AL MORINVILLE 3-5-56-25 | |
| Operator Name: General Energy Recovery Inc. | |
| License Number: 0123340 | |
| License Date: 1986-06-20 | |
| License Status: RecCertified | |
| Spud Date: 1986-07-08 | |
| Final Drill Date: 1986-07-13 | |
| Well Total Depth: 1373.00 m | |
| Surface Hole Latitude: 53.807130 | |
| Surface Hole Longitude: -113.685373 |
| Date | Event |
|---|---|
| 1986-06-20 | Obtained License |
| 1986-07-08 | Surface Casing Operation Performed |
| 1986-07-13 | Finished Drilling |
| 1986-07-13 | Well Mode changed to Drilled and Cased |
| 1986-07-14 | Kick Occurred |
| 1986-07-14 | Lost Circulation Occurred |
| 1986-07-14 | Well Log Performed |
| 1986-07-15 | Drill Stem Test Performed |
| 1986-07-16 | Drill Stem Test Performed |
| 1986-07-17 | Production Casing Operation Performed |
| 1986-07-18 | Rig Released |
| 1986-08-12 | Well Log Performed |
| 1986-08-19 | Perforation Treatment Performed - Jet Perforation |
| 1986-08-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1986-08-24 | Perforation Treatment Performed - Open-Hole Completion |
| 1986-08-26 | Well Began Production |
| 1986-08-26 | Well Fluid changed to Crude Oil |
| 1986-08-26 | Well Mode changed to Flowing |
| 1986-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1986-10-17 | Plug Back Performed |
| 1986-10-17 | Well Fluid changed to Crude Oil |
| 1986-10-17 | Well Mode changed to Abandoned Zone |
| 1987-03-10 | Well Log Performed |
| 1987-03-11 | Perforation Treatment Performed - Jet Perforation |
| 1989-03-08 | Perforation Treatment Performed - Jet Perforation |
| 1989-03-08 | Well Log Performed |
| 1989-03-09 | Perforation Treatment Performed - Cement Squeeze |
| 1989-03-12 | Perforation Treatment Performed - Jet Perforation |
| 1989-03-14 | Perforation Treatment Performed - Jet Perforation |
| 1989-03-14 | Well Log Performed |
| 1989-03-17 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 1989-03-23 | Perforation Treatment Performed - Alcohol Squeeze |
| 1997-12-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1997-12-15 | Plug Back Performed |
| 1997-12-16 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1986-08-19 | Perforation | 1369.90 | 1370.90 | 13 |
| 1989-03-17 | Hydra Jet Perforation | 1079.50 | 1081.00 | 0 |
| 1989-03-23 | Alchohol Squeeze | 1074.00 | 1081.00 | 0 |
| 1997-12-15 | Packing Device Capped w/Cement | 1062.00 | 1070.00 | 0 |
| 1986-08-20 | Acid Treatment | 1369.90 | 1370.90 | 0 |
| 1986-08-24 | Open Hole/Barefoot Completion | 1369.80 | 1373.00 | 0 |
| 1986-10-17 | Packing Device Capped w/Cement | 1342.00 | 1350.00 | 0 |
| 1987-03-11 | Perforation | 1076.00 | 1080.00 | 13 |
| 1989-03-08 | Perforation | 1086.00 | 1086.60 | 13 |
| 1989-03-09 | Cement Squeeze | 1076.00 | 1086.60 | 0 |
| 1989-03-12 | Perforation | 1074.00 | 1078.00 | 13 |
| 1989-03-14 | Perforation | 1078.00 | 1080.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1986 | 1048 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1986-07-14 | Kick | 1370.00 | 1370.00 |
| 1986-07-14 | Lost Circulation | 1370.00 | 1370.00 |
For data sources see[6]